Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a fire / police facility in Dayton, Ohio. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
o Firm's Average Revenue. o Identify Firm's annual revenue from similar construction projects for the past seven (7) years. o Identify Firm's total annual revenue for each of the past seven (7) years. The CMR will work cooperatively with the City, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the agreement, such partially completed documents (the "Basis Documents") shall be provided to the CMR, together with the A/E's detailed listing of any incomplete design elements and the A/E's statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the City's approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum ("GMP Amendment"). If the proposed Contract Sum exceeds the Project Budget established for construction, then the City may terminate the agreement with the CMR and seek proposals from other firms for completion of the Project. Owner Rights: The City reserves the right to reject any and all qualifications, to waive any irregularities in a qualification, or to accept the qualification(s) which in the judgment of proper officials, is in the best interest of the City. The City reserves the right to accept a part or parts of a Issue RFQ: March 20, 2024 Last Day to Submit Questions: 3:00 PM local (Dayton OH) time on March 28, 2024 Written Responses to Questions: By 5:00 PM local (Dayton OH) time on April 4, 2024 Due Date for Statement of Qualifications: 12:00 PM local (Dayton OH) time on April 12, 2024 qualification unless otherwise restricted in the RFQ or issue subsequent RFQs. The City reserves the right to approve or reject any subFirms proposed for work under this qualification or waive any minor irregularities. Last Day to Submit Questions: 3:00 PM local (Dayton OH) time on March 28, 2024 Written Responses to Questions: By 5:00 PM local (Dayton OH) time on April 4, 2024. Bond Notes: For construction or facility improvement contracts or subcontracts exceeding the Simplified Acquisition Threshold, the Federal awarding agency or pass-through entity may accept the bonding policy and requirements of the non-Federal entity provided that the Federal awarding agency or pass-through entity has made a determination that the Federal interest is adequately protected. If such a determination has not been made, the minimum requirements must be as follows: (a) A bid guarantee from each bidder equivalent to five percent of the bid price. The "bid guarantee" must consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of the bid, execute such contractual documents as may be required within the time specified. (b) A performance bond on the part of the contractor for 100 percent of the contract price. A "performance bond" is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract. (c) A payment bond on the part of the contractor for 100 percent of the contract price. A "payment bond" is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract.
Post-Bid
Fire / Police
$500,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2024
May 13, 2024
To Be Determined, Dayton, OH
Related To This Project
Dayton, OH
Bid Date: May 09 2024
Dayton, OH
Bid Date: Apr 17 2024
Dayton, OH
--
Dayton, OH
Bid Date: Apr 18 2024
Dayton, OH
Bid Date: Apr 18 2024
Dayton, OH
Bid Date: Apr 25 2024
Dayton, OH
Bid Date: Apr 12 2024
Dayton, OH
Bid Date: May 15 2024
Dayton, OH
--
Dayton, OH
Bid Date: Apr 02 2024
Dayton, OH
Bid Date: Apr 04 2024
Dayton, OH
Bid Date: Mar 15 2024
Dayton, OH
Bid Date: Mar 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.