BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sugar Land, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Wastewater Treatment Plant Improvements for Plantation Municipal Utility District including but not limited to mobilization, bonds and insurance, rehabilitation and protective coatings of Lift Station No. 1 influent manhole; recoating Lift Station No. 1 valve vault cover, surface preparation and recoating of the Lift Station No. 2 wet well along with the application of concrete repair mortar to damaged sections inside of structures; demolishing and replacing Lift Station No. 2 wet well riser piping, complete with protective coatings; bypass pumping and flow through gravity bypassing while the work is being performed on Lift Station No. 2 and the influent manhole; miscellaneous lift station electrical work including replacement and rehabilitation of the terminal boxes, terminal blocks, and wiring; installing duct seal at all conduit penetrating the wet wells; miscellaneous steel structure rehabilitation including repairs to the dewatering canopy and clarifier walkway; extension of the existing on-site potable water line to install a permanent emergency eyewash/shower station; construction of new sludge transfer pump station foundation and containment slab, including relocation of the existing sludge pump to the new slab, installation of a second sludge transfer pump for redundancy, and piping tie-in to the existing dewatering facility, electrical control panel and controls; miscellaneous equipment and piping recoating; electrical improvements including replacement of the main distribution panel, replacement and relocation of existing Motor Control Center (MCC), MCC weather resistant enclosure, new automatic controls, new underground conduit and wire from new MCC location up to existing MCC location, tie-in of existing electrical loads, and new low voltage transformer and lighting panel. Estimate: 2,085,000 Question Deadline 04/08/2024 at 10:00 AM CT Questions must be submitted electronically on www.civcast.com

Post-Bid

Water / Sewer

$2,085,000.00

Public - County

Paving, Site Work

38

20

2

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
49
Bidding Soon
2,637
All Active Projects
876
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

June 10, 2024

img_map_placeholder

802 Tara Plantation Dr, Sugar Land, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.