BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2024 at 8:00 PM

Updated May 22, 2024

Site work and paving for a sidewalk / parking lot in Beloit, Wisconsin. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of 5/21/2024 the Owner pulled this project and will not be moving forward with it. Company Description The School District of Beloit, Wisconsin educates and nurtures approximately 5300 students in 6 elementary schools, 2 middle schools, 1 alternative school and 1 high school. After school programs are also offered. Activities include sports from elementary to Division I high school level, gifted and talented student competitions, homework and enrichment clubs, fine arts, orchestra and band, leadership organizations and more. Current state of parking lots Aldrich Middle School's parking lots currently contain 120 stalls that are divided between the north, south and west lots (see picture below). The parking lots have significant alligator cracking throughout the areas as well as potholes and shallow surface defects in both the north and west side parking lots. Questions to be emailed to tbricco@sdb.k12.wi.us April 12, 2024 by 2:00 PM

Final Planning

Sidewalks / Parking Lot

$1,415,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
643
Active Projects
371
Bidding Soon
3,627
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

June 18, 2024

Project location map

1859 Northgate Dr, Beloit, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.