BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and renovation of an educational facility in La Junta, Colorado. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Founded in 1941, Otero College is located on an attractive 40-acre campus on the southern edge of La Junta, Colorado. The town itself lies at an elevation of 4,002 feet, has a population of 6,800. La Junta is located in the Arkansas Valley, right in the heart of Southeast Colorados farming and ranching country The Humanities Center at Otero Junior College was constructed in 1971 with additional classrooms and faculty offices built in 1997. The initial building includes a theatre, classrooms, offices, and storage rooms that contain 9" square floor tile presenting an asbestos threat. After a thorough testing for traces of Asbestos, it was found that the flooring in the initial building must/shall be abated before new flooring is installed. Some of the offices and portions of the theatre area have had carpet installed over the top of the tile. The carpet is quite worn, and need sv replaced. In a storage area, some of the tile has become loose and is coming off the floor creating an asbestos exposure threat. This storage area also contains the Sprinkler system risers and will need some light framing and drywall work for separation from the main storage area. In addition, there is sprayed on insulation on some to the piping and above false ceiling panels that contain asbestos. The auditorium theatre area contains approximately 530 seats that have been in place since the building was constructed in 1971. The seats are bolted to the floor and sit on top of the 9" square tile that contain asbestos. The seats will need to be removed to abate the asbestos and may become contaminated with asbestos. On the upper level of the initial structure is a Gender-Neutral Restroom that has a cracked sewer pipe that will require some re-enforced The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond

Award

Educational

$577,239.00

Public - State/Provincial

Asbestos Abatement, Renovation, Site Work

14

13

10

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
9
Bidding Soon
146
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 17, 2024

img_map_placeholder

1802 Colorado Ave, La Junta, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.