BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2024 at 8:00 PM

Updated April 23, 2024

Site work and paving for a mixed-use development in Amador Township, Minnesota. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

In general, the project work consists of reclaiming, grading/shaping, bituminous paving on existing bituminous street within a residential neighborhood and placing an aggregate shoulder. Also included is minor subgrade correction work and minor storm sewer culvert pipe replacements in various locations throughout the Project Site Description: In general, Work consists of the following approximate quantities: 280 LF CMP Culvert 180 LF Ditch Cleaning 22,800 SY Reclaim Bituminous Pavement 120 CY Select Granular Borrow 22,800 SY Subgrade Preparation 4,800 TN Bituminous Pavement 930 TN Aggregate Base, Shouldering 8,200 LF Striping (Latex or Epoxy Paint) Along with clearing and grubbing, restoration, and correlated appurtenances. Additional Description: All plan holders who order electronic proposals through Online will receive addenda as they are released; however, it is the Contractor's full responsibility to ensure they have received all addenda prior to the submittal of bids.

Bid Results

Roads / Highways

$550,554.00

Public - County

Paving, Site Work

11

12

8

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
122
Bidding Soon
1,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

May 13, 2024

Project location map

Multiple Locations, Amador Township, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.