BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2024 at 8:00 PM

Updated February 8, 2025

Site work for a water / sewer project in Clinton, Pennsylvania. Completed plans call for site work for a water / sewer project.

Questions Due Date: Mar 28th 2024, 4:30 PM EDT Deadline to submit Questions via Online Portal Estimated Contract Value: $924,880.00 Findlay Township Authority (Owner) is requesting Bids for the construction of the following Project: 2023-02A Hebron Loop Waterline Project 2023-02B Leopold Lane Waterline Project The Project includes the following Work: Work under Contract 2023-02 covers the furnishing of all labor, material, plant, utilities, and services required for the construction of public drinking water facilities and appurtenances. The project is located in Findlay Township, Allegheny County. The Project has an expected duration of one hundred twenty (120) days. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each builder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Owner hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the Bid Due Date. Deadline to submit Questions via Online Portal Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the "Messages/Vendor Discussions" feature in Online Portal no later than seven (7) days prior to the date for receipt of bids

Bid Results

Water / Sewer

$157,000.00

Public - City

Site Work

20

17

7

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
132
Bidding Soon
2,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

Project location map

Multiple Locations, Clinton, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.