Site work for a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of April 26, project is awarded to following contractors: Contract A- Jet Jack Inc.in the amount of 252,060 Contract B- Soli Construction Inc. in the amount of $211,000 Questions Due Date: Mar 21st 2024, 5:00 PM EDT Notice to Proceed - April 25, 2024 Substantial Completion - December 1, 2024 Final Completion - December 31, 2024 Contact Information: Scott R. Baker, sbaker@gatewayengineers.com 2024 CRAFTON BOROUGH O&M SEWER REPAIRS Contract A - Manhole to Manhole Lining Contract This project involves combination sewer CIPP rehabilitation work including, but not limited to, full length CIPP lining; pre and post NAASCO CCTV inspection; internal reinstatement of active service laterals; internal removal of protruding service laterals; site access development and restoration; resident, business and municipal notifications; bypass pumping; traffic control; site restoration and all appurtenances required by the Contract Documents, complete in place. Contract B - Excavation Repairs Contract This project involves combination sewer open cut rehabilitation work including, but not limited to: open cut point repairs; removal and replacement of wye and lateral pipe; installation of manholes; location and adjustment of buried sewer manholes; manhole invert replacement; CCTV verification of repair locations; post-repair NASSCO certified CCTV; site access development and restoration; resident, business and municipal notifications; bypass pumping; traffic control; site restoration and all appurtenances required by the Contract Documents, complete in place. Contracts A and B are separate and independent contracts. Bidders may bid on one or both Contracts if they are qualified to perform the work. Pennsylvania Prevailing Wage Rates are required to be paid on this Project. Proposals must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Crafton Borough in an amount equal to ten (10%) percent of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within fifteen (15) days after Notice of the Award of the Contract. Proposals shall be made to Crafton Borough, Allegheny County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw his Proposal during the sixty (60) day period without forfeiting his Bid guarantee. The Borough retains the right to award Contracts to the lowest responsive, qualified, and responsible Bidder based on consideration of quality of previous work; record of completing projects on time; history of payments to subcontractors and suppliers; maintenance of a permanent place of business; adequacy of equipment and plant to do the work; technical experience; a solid financial base to guarantee contract completion and all other factors deemed relative by the Borough. However, Bidders are advised that the Borough expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest responsible, responsive and qualified Bidder a contract for all or any portions of the work listed in the Proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed. Performance, Maintenance, and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement upon acceptance of the Proposal from the successful Bidder. Crafton Borough also reserves the right to reject any or all Proposals, or any part thereof, for any reason, and reserves the right to waive any informality therein. Bid Result - Contract A - MH to MH Lining - Osiris Enterprises - $ 186,265.00 Contract B - Excavation Repairs - Jet Jack, Inc - $ 252,060.00

Award

Water / Sewer

$463,060.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
37
Bidding Soon
839
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 25, 2024

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.