BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Flint, Michigan. Completed plans call for the renovation of a municipal facility.

** As of June 4, 2024 this project has been awarded to Deikevers Roofing but no amount available.** Reference Number 0000346051 Bid Intent Optional Bid Intent Deadline 04/11/2024 05:00 PM EDT Question Acceptance Deadline 04/11/2024 05:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Certified Payroll - Installation Required - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required - Warranty Information Required 6/7/2024 Begin work 6/14/2024 Final construction documents and schedule review 7/15/2024 Proposed New Roof 100% Complete 7/31/2024 Proposed Project Close-out Each Proposal shall be accompanied by a cashier's check or a bid bond by an approved surety company in the amount of five percent (5%) of the base Proposal payable to the MTA and will be forfeited to the MTA on failure to enter into a contract within ten (10) days after notice of acceptance of the Proposal. o Comply with MIOSHA requirements at all times while on project. o Traditional Construction services, including but not limited to monitoring construction schedule, conformance to construction documents, conduct job meetings, and facilitate project closeout process. o Conform to the requirements of the pay items included in the Project Specifications. In the event of a conflict between these specifications, the Owner's Representative shall make the final determination. o Meet all Construction Specifications highlighted in this RFP. o Produce construction documents sufficient for permitting, bidding, and construction. o Provide a designated area for demolition waste containers. New material storage for equipment and parking will be provided for roofing crew during the construction. Contractor shall provide covering for such containers as to prevent public salvaging of items. Leaching of products from container vessels will not be tolerated. The Contractor shall provide all labor and materials necessary to accomplish this work. Confine all construction and demolition including equipment placement / materials placement to and from the roof areas to within the areas designated. o No additional compensation will be permitted as a result of time extensions due to adverse weather conditions approved by the Owner's Representative. o Provide site survey locating and recording locations of existing utilities including rooftop storm drainage, affected electrical and gas services, affected water services, and all other rooftop points of entry o Do not use HVAC systems top covers for storage of equipment or products. All sealants glues or solvents or types' products of aromatic odor shall not remain open around HVAC fresh air intakes. MSDS sheets must be provided for all solvents, glues or cleaners. o Remove roofing material strategically to prevent open roof sections. Weather conditions rain/sleet must be prevented from leaking inside building. Prevention of damage inside of building areas will be contractor's responsibility. o Remove existing rock ballast from roof and remove from jobsite. o Remove all coping cap covering all parapet walls. o Tear off existing membrane exposing existing insulation and remove debris from job site. o Remove all insulation and remove debris from jobsite. o Inspect precast gypsum decking: Repair damaged or unsound decking with USG Securock gypsum concrete patch or similar 'trade name' product acceptable to MTA. (provide unit price) o Inspect steel decking: remove & replace rusted steel decking that is no longer structurally sound. For decking that is rusted but still structurally sound wire brush, clean, then apply a rust convertor or inhibiter primer (provide unit prices for repair and for replacement) o Install insulation under the trade name Carlisle SynTec Systems InsulBase polyisocyanurate or similar comparative product acceptable to MTA. Including using tapered insulation to meet roof drain and pitch specification of 1/4 " per foot slope (2.08%). o Mechanically fasten insulation to steel deck with heavy duty screws and stress plates at the rate of 12 fasteners per 4'x8' board in the field with enhancements in the perimeter and corners to comply with FM 1-90 criteria. Apply insulation to roof precast gypsum decking with hot asphalt or lo-rise polyurethane adhesives. o Provide Carlisle SynTec U12A.1roof/parapet flashing detail or approved equal for 90 MPH wind speeds at juncture of roof and parapet walls per manufacturers specifications. o Install Carlisle SynTec Systems "FleeceBack" PVC FRS, option color "white", fully adhered 60mil thick system, or similar membrane system acceptable to MTA and strictly according to the manufacturer's specifications over secured insulation assembly. Install 24 gauge fluoropolymer Kynar 500 coated coping in standard color as selected by MTA. Use continuous 22 gauge galvalume steel clip at parapet walls. Remove and replace all damaged or deteriorated wood nailers or shims. o Provide 36" x 30" Bilco steel roof hatch and aluminum cover with steel ladder access from within building per MTA selected location. Also provide Bilco ladder up safety post ladder from low roof to main roof in MTA selected location. Provide shop drawings for approval. o Install new PVC or approved equal membrane walk pads around all sides of HVAC equipment including main pathway from Owner selected locations to all directions going to RTU's or other equipment. o Install all sealants, flashings & details in strict accordance with manufacturer's specifications. o Inspect sump roof drain systems and connections for decay or rotting. (Provide unit pricing for replacement of drain and connection to interior roof conductor system.) o Replace gas piping and electrical conduit supports and all material supports as and where required. o Remove any exhaust ports/stacks not currently in use. Patch holes using manufacturer specified guidelines. o MTA Maintenance staff will raise any HVAC service lines as needed. o Proposer will be responsible for meeting insulation values according to Michigan Uniform Energy Code Part 10. 5/23/2024 MTA Board of Directors Meeting 5/27/2024 Contract Award

Award

Municipal

$500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
71
Bidding Soon
1,354
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 7, 2024

img_map_placeholder

1717 S Dort Hwy, Flint, MI

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.