Site work for a water / sewer project in Vermillion, South Dakota. Completed plans call for site work for a water / sewer project.
As of June 19, 2024 project was awarded to Hulstein Excavating, Inc, awarded amount is $1,286,601.25. The estimated cost range for this project is $1,000,000-$2,500,000. The Project includes the following Work: Furnish and install approximately 5650 LF of 6-inch diameter water main underneath roadway. Furnish and install necessary tracer wire, valves, fittings, joint restraints and concrete thrust blocks to provide a complete and functioning potable water main; Asphalt Concrete, Concrete paving and Curb and Gutter installation. Temporary and permanent erosion control, reclamation and seeding. Water main flushing, hydrostatic pressure testing and disinfection; and Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner if the successful bidder refuses or fails to enter into an Agreement within fifteen. (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The MBE goal for this project is 1% of the total dollar value of the job while the WBE goal is 4% of the total dollar value of the job. The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.2%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. The low responsive bidder will be required to certify compliance with the American Iron and Steel provisions of the Consolidated Appropriations of Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. Question Deadline May 22, 2024
Award
Water / Sewer
$1,286,601.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2024
September 15, 2024
Multiple Locations, Vermillion, SD
Related To This Project
Vermillion, SD
Bid Date: Sep 29 2020
Vermillion, SD
Bid Date: Apr 24 2024
Vermillion, SD
Bid Date: Apr 25 2024
Vermillion, SD
--
Vermillion, SD
--
Vermillion, SD
Bid Date: May 14 2024
Vermillion, SD
Bid Date: May 21 2024
Vermillion, SD
Bid Date: Jun 07 2024
Vermillion, SD
Bid Date: Apr 04 2024
Vermillion, SD
--
Vermillion, SD
Bid Date: Mar 21 2024
Vermillion, SD
Bid Date: Mar 14 2024
Vermillion, SD
Bid Date: Mar 14 2024
Vermillion, SD
Bid Date: Mar 01 2024
Vermillion, SD
Bid Date: Feb 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.