BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated May 3, 2024

Site work and paving for a mixed-use development in South Lyon, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The awarded contractor for the 2024 Road Improvement Program in South Lyon is Florence Cement Company for $2,078,944.43. The anticipated start date for the project is June 1st , 2024. 1.3 miles of road rehabilitation including concrete curb, sidewalk and HMA paving DEPOSIT: 5%% of bid amount The project consists of rehabilitation/reconstruction of the existing pavements within the Brookfield and Eagle Way subdivisions as part of the 2024 Road Improvement Program for the City of South Lyon, Oakland County, Michigan. The following roadways are included within the Brookfield Subdivision scope of work: Brookfield Drive and Brookfield Court. The following roadways are included within the Eagle Way Subdivision scope of work: Eagle Way, Talon Court, Feather Court, Downey Nest Court, and Eagle Crest Drive. No traffic information was available upon completion of this report. However, we assume traffic is primarily cars with the occasional delivery and garbage truck. The purpose of our investigation is to determine and evaluate the general pavement and subsurface conditions within the two subdivisions and develop general recommendations for the proposed pavement rehabilitation/reconstruction. Description This work consists of removing concrete pavement for pavement repairs in accordance with Section 603 of the MDOT 2020 Standard Specifications for Construction except that all pavement removal for pavement repairs will be paid for using the pay item Pavt Repr, Rem, Special regardless of the size of the slab removed for the repair. Additionally, the pay item Pavt Repr, Rem, Special shall include intermediate saw cutting as required to remove and dispose of the concrete. Copies of Plans and Specifications and Proposal Forms shall be available on or after 12:00 p.m. on March 22, 2024. Please contact Mitch Kelley at Hubbell, Roth & Clark, Inc by email mkelley@hrcengr.com to obtain a copy of the Drawings and Specifications which will be sent to the prospective bidder electronically. Question Deadline 04/09/2024 at 3:00 PM ET Submit all questions to Engineer at: Mitchell Kelley mkelley@hrcengr.com Hubbell, Roth & Clark, Inc.

Award

Sidewalks / Parking Lot

$2,078,944.00

Public - City

Paving, Site Work

48

10

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
162
Bidding Soon
2,509
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

Project location map

Multiple Locations, South Lyon, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.