Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Renovation of an educational facility in Sault Sainte Marie, Michigan. Working plans call for the renovation of a educational facility.

**As of June 21, 2024, the owner decided not to continue with the project. As of this time it is unknown if and when project will rebid. You are invited to submit a bid for a twenty-four-foot wood wishbone type arm gate barrier that will be installed at Sault Area Middle School, 684 Marquette Ave, Sault Ste Marie, MI 49783. Your proposal should be based on the following: All labor, equipment, and materials to install the 24' arm gate barrier. Electronic vehicle tag reading system for gate operation integrating with existing Vanderbilt system within the building. Directional Boring from east side of drive to the building Installation, check & test, and clean-up. Restoration of area affected including topsoil, grading, and seeding as needed. You must also include a signed copy of the Familial Relationship Disclosure Form and the Iran Economic Sanctions Act attached. Questions regarding the specifications should be directed to Tom Nelson, Maintenance and Transportation Director. Tom can be reached via e-mail at nelsont@eupschools.org or phone at 906-635-3839 ext. 5651.

Final Planning

Educational

$980,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
146
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

December 20, 2024

Project location map

684 Marquette Ave, Sault Sainte Marie, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed