BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2024 at 8:00 PM

Updated May 24, 2024

Site work and paving for a mixed-use development in Kentfield, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project is located in Creekside Marsh, a restored wetland between Bon Air Road and the Corte Madera Creek multi-use pathway. The scope of the project generally includes removing 2,300 square feet of existing asphalt pathway and an existing wood-framed bridge and foundations; and the installation of a new prefabricated bridge, an elevated wooden boardwalk, and new sections of asphalt pathways. The new bridge, boardwalk and pathway will be 10-feet wide and shall be compliant with all ADA accessibility requirements. The existing asphalt pathway will be removed, backfilled with native soils, and regraded to match existing adjacent grades. Construction of the new raised pathway includes the use of asphalt pavement, aggregate base, and lightweight backfill material. The purpose of the lightweight backfill is to reduce settlement in the underlying bay mud. A Bid Bond, cash, certified check, or cashier's check, in the amount of 10% of the total bid amount payable to the County of Marin shall accompany the Proposal. The Performance Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in their proposal. The Payment Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in their proposal. The new prefabricated bridge will span 120 feet between new concrete abutments. The new wooden boardwalk will be approximately 41 feet in length and span between new concrete abutments. Helical piers will be utilized to support the concrete abutments and wooden boardwalk. The new sections of asphalt pathways will be installed at both ends of the project, adjacent to the new prefabricated bridge and adjacent to the new wooden boardwalk. Construction of bridge abutments, boardwalk, and raised pathway will be outside the limits of wetlands. Engineer's Estimate: $1,393,150 Question Deadline 05/15/2024 at 5:00 PM PT Questions concerning the Bid should be submitted via online portal. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening.

Award

Bridges / Tunnels

$1,218,413.00

Public - County

Paving, Site Work

14

28

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
138
Bidding Soon
3,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

Project location map

255 Bon Air Rd, Kentfield, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.