BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Florence, Alabama. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

https://www.waaytv.com/news/una-breaks-ground-on-bank-independent-stadium-project-on-track-for-2026-completion-date/article_74551c8e-2a8e-11ef-9848-230b3713137d.html UNA breaks ground on Bank Independent Stadium; Project on track for 2026 completion date FLORENCE, AL – After more than 50 years of planning, hoping, and dreaming, the Bank Independent Stadium project at the University of North Alabama got a big step closer to fruition as members of the UNA Board of Trustees, campus administration, and Bank Independent representatives gathered Friday afternoon at the site of the on-campus stadium to break ground. ___________________________________________ https://www.bizjournals.com/birmingham/news/2024/06/20/bham-company-and-una-partnering-on-stadium.html HPM, a Birmingham-based program management firm, is partnering with the University of North Alabama to bring Bank Independent Stadium to Florence. The stadium will be a multipurpose facility on UNA's campus, and HPM also is providing owner’s representation and preconstruction services for the project. -------------------------------------------------------------------------------- https://thebamabuzz.com/university-of-north-alabama-breaks-ground-on-new-65m-stadium/ University of North Alabama breaks ground on new $65M stadium The University of North Alabama will soon be getting a new football stadium and fans were out in support Friday afternoon for the official groundbreaking. Bank Independent Stadium will be a multipurpose stadium located on the UNA campus. Keep reading for more details about the stadium + highlights of the groundbreaking event. __________________________________ Bank Independent Stadium - New Baseball Field & Mass Grading This project will include: The site work will consist of demolition of the existing baseball and practice fields, erosion control, mass excavation and temporary drainage for the new football field, utilities and infrastructure required for the new baseball field. Construction of a new baseball field will include new artificial turf, new press box with restroom and storage, new bleacher seating, site retaining walls and parking A certified check or bid bond payable to The 1830 Foundation in an amount not less than five (5) percent of the amount of the Bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. General Contractors and Prime Sitework Contractors are required to pre-qualify prior to requesting bid documents. Prequalification responses will be due at 5:00 pm local time on April 2, 2024. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. The 1830 Foundation is an EEO/AA employer, and any successful bidder will be required to comply with applicable federal and state laws and executive orders. The 1830 Foundation reserves the right to cancel the procurement at any time for any reason Addendum #1-#5 have been issued as of 5-16-2024.

Post-Bid

Playgrounds / Parks / Athletic Fields

$9,000,000.00

Public - State/Provincial

Demolition, Paving, Site Work

190

32

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
25
Bidding Soon
430
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2024

July 8, 2024

img_map_placeholder

1 Harrison Plaza, Florence, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.