Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2024 at 8:00 PM
Updated April 10, 2024
Renovation of an educational facility in Kailua, Hawaii. Completed plans call for the renovation of a educational facility.
Keolu Elementary School - Building B - Install Window Air Conditioning Units Six (6) 24,000 BTU Window A/C LG model LW2422IVSM or approved equal in two (2) each in rooms: B103, B104 & B105. One (1) 42,000 BTU 12.60 SEER Mitsubishi PCA-A42KA8/PUY-A42NKA7 Electric Inverter driven wall mounted ductless split a/c system in room: B102. Air Conditioning Units: 1. Before ordering equipment, provide specifications of A/C units to Project Coordinator for approval. 2. All units must be Energy Star-rated with a minimum CEER of 10.3. 3. All A/C units shall be installed with condensation drain lines. 4. Any equipment and/or installation changes identified during the pre-bid meeting/walkthrough shall be verified and approved by the Project Coordinator. Changes will be posted as an Addendum to the Scope. 5. All AC units will be framed with painted 2 x 4. If not framed, changes identified shall be verified and approved by the Project Coordinator. 6. All wood around the AC units will be painted (interior and exterior). Electrical: 1. Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, etc 2. Sub-panels shall be added if needed. If possible, new panel should contain all AC breakers. 3. Coordinate with PC if Electrician needs to do assessment. Patching 1. All penetrations through walls/windows shall be completely sealed. 2. All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. 3. Any damages caused by the Contractors work shall be properly patched and painted to match surrounding areas. Windows/Louvres 1. Windows and louvres must be operational post-installation. A pre-con meeting shall be held no less than 2 weeks prior to starting construction. The contractor should coordinate this with each school individually.
Post-Bid
Educational
$120,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
May 9, 2024
1416 Keolu Dr, Kailua, HI
Related To This Project
Kailua, HI
Bid Date: Apr 25 2024
Kailua, HI
Bid Date: May 24 2024
Kailua, HI
Bid Date: Jun 05 2024
Kailua, HI
Bid Date: May 17 2024
Kailua, HI
Bid Date: Jun 04 2024
Kailua, HI
Bid Date: Jun 21 2024
Kailua, HI
Bid Date: Jan 29 2025
Kailua, HI
Bid Date: Jan 31 2025
Kailua, HI
Bid Date: Apr 11 2024
Kailua, HI
Bid Date: Mar 22 2024
Kailua, HI
Bid Date: Mar 13 2024
Women's Community Correctional Center Architectural Barrier Removal & Related Improvements - 5290901
Kailua, HI
Bid Date: Mar 07 2024
Kailua, HI
Bid Date: Dec 13 2023
Kailua, HI
Bid Date: Feb 02 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
