BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to an educational facility in Fontana, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Consult the General Conditions, Supplementary Conditions, and General Requirements bid requirements. under Planrooms click on "Order from PlanWell", click on the "Go" button under Public Planroom, and search Fontana Unified School District in the dropdown list, or call ARC and request the Planwell Department for orders. Downloads are available at no charge. Hardcopy/paper cost will be available with project information. The costs for all project documents are nonrefundable. Any mailing costs are direct with reprographic company. Bidders shall be responsible for monitoring the website to obtain information regarding any revisions for this solicitation. Failure to respond to required updates may result in determination of a nonresponsive bid. As a condition of submitting a bid for this Project, and in accordance with California Public Contract Code section 20111.6, prospective bidders are required to be prequalified. Bids will not be accepted if prospective bidder has not been prequalified where prequalification is required. The District uses and will accept prequalification applications through PQ Bids only. The link can be accessed by going to the Fontana Unified School District website. Prequalification documents must be submitted to PQ Bids by April 5, 2024, at 4:00 p.m. The last day to be approved through PQ Bids is April 16, 2024, at 4:00 p.m. This prequalification is mandatory for all prospective bidders to be considered; bidders that do not meet these deadlines will be deemed as nonresponsive. Once the bidder isfinal approved through PQ Bids, they will be approved for one (1) year from the final approval date. It is and will be the bidders' sole responsibility to stay updated and approved in the PQ Bids system. The District has no responsibility to contact contractors to apply, renew or update information in the PQ Bids system. Any questions or technical support inquiries in submitting the required documents may be directed to PQ BIDS at info@pqbids.com or by calling 888-218-4173. (NOTE: Use the questionnaire type: AB2031-Projects, Agency Name: Fontana Unified to prequalify on the PQ Bids website). The approved list of prequalified contractors will be posted on the ARC website. All requests for information must be submitted, in writing, to Norma Reyes Buyer, via email address bidinquiries@fusd.net and received no later than 4:00 p.m. on April 11, 2024. Each bidder shall submit with its bid -- on the form furnished with the Contract Documents -- a list of the designated subcontractors on this Project asrequired by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code section 4100 et seq. In accordance with California Public Contract Code section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the District, or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the Contractor. Upon satisfactory completion of the Contract, the securities shall be returned to the Contractor. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. Pursuant to California Labor Code section 1720 et seq., it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon any subcontractor under such Contractor, to pay not less than the said specified rates to all workers employed by them in the execution of the Contract. Contractor and all subcontractors must also comply with the Davis-Bacon and related acts - see Supplementary Conditions. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in the The Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/Department of Labor Standards Enforcement (DLSE). The engineer's estimate is $3,500,000. No telephone or facsimile machine will be available to bidders on the District premises at any time. It is each bidder's sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened.

Award

Educational

$3,845,600.00

Public - City

Addition, Demolition, Renovation, Site Work

166

37

4

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
102
Bidding Soon
2,219
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.