Published March 29, 2024 at 8:00 PM

Updated April 6, 2024

Site work for a bridge / tunnel in Norwich, Vermont. Completed plans call for site work for a bridge / tunnel.

Existing culverts will be removed and replaced at various locations on Route 132 and Turnpike Road. The work will also include paving, replacement of shoulder gravel, erosion stone placement at entrance and outfall of culverts, and installing culvert markers. The following culverts (locations are approximate and will be confirmed in the field) are to be replaced as follows: 1. Route 132 a. Culvert No. 21 located at Longitude and Latitude: 43.774800 -72.258000 2. Turnpike Road a. Culvert No. 7 located at Longitude and Latitude: 43.729700 -72.316700 b. Culvert No. 9 located at Longitude and Latitude: 43.731700 -72.316800 c. Culvert No. 10 located at Longitude and Latitude: 43.732600 -72.316800 d. Culvert No. 13 located at Longitude and Latitude: 43.735200 -72.316900. The culverts above located both on Route 132 and Turnpike Road (See Figure 1) are in poor condition and current conditions are described below: 1. Route 132 a. Culvert No. 21 is an existing 15-inch diameter steel pipe in fair condition. The pipe has corrosion, undersized, and is mostly plugged. Approximately 35 feet in length. 2. Turnpike Road a. Culvert No. 7 is an existing 15-inch diameter steel pipe in fair condition. The pipe has corrosion, clogged, and is undersized. Approximately 35 feet in length. b. Culvert No. 9 is an existing 15-inch diameter steel pipe in poor condition. The pipe has corrosion, clogged, and is undersized. Approximately 30 feet in length. c. Culvert No. 10 is an existing 12-inch diameter plastic pipe in poor condition. The pipe is clogged and undersized. Approximately 40 feet in length. d. Culvert No. 13 is an existing 15-inch diameter steel pipe in poor condition. The pipe has corrosion, end damage, clogged, and is undersized. Approximately 40 feet in length. The Town would like to have the project completed as soon as possible, but in no case no later than August 30, 2024. The Town intends to open bids on April 5, 2024, at the Town Office; and the Select board intends to select a contractor in April 2024. Questions may be submitted by email to Chris Kaufman at the following address: ckaufman@norwich.vt.us. The due date for questions is Friday, March 29, 2024, at 3:00 PM. The Town reserves the rights to select any bid for any reason, and to reject any or all bids.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
130
Bidding Soon
1,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 6, 2024

Project location map

Multiple Locations, Norwich, VT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.