BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Warwick Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

2024 York Road Sidewalk Extension Project. Question Deadline 04/03/2024 at 4:00 PM ET. Deadline to submit Questions All work and materials shall be in accordance with PennDOT Standards and Specifications. The successful bidder will be required to furnish separate bonds with corporate surety issued by companies authorized to do business in the Commonwealth of Pennsylvania on the prescribed forms dated the date of the Contract, or separate Federal or Commonwealth chartered lending institution irrevocable letters of credit in a form accepted and approved by the Township, each equal to one hundred percent (100%) of the Contract amount, to secure (a) the faithful performance and maintenance of the Contract; and (b) the prompt payment of materials and labor. Bids must be accompanied by an executed Non-Collusion Affidavit as set forth in the Contract Documents. Failure to submit an Affidavit with the bid proposal may result in disqualification of the bid. Proposals must be made upon the forms furnished by the Township, as available on PennBid. This project is subject to the terms and conditions of the Pennsylvania Prevailing Wage Act, as determined by the Secretary of Labor and Industry and, therefore, must be bid as such. Estimated Contract Value: $295,000 contained in the Proposal and Contract Section of the Contract Documents, provides the quantities for each roadway. The "Instructions to Bidders" Section describes the bidding requirements under this Contract.. The Contract will generally include the construction of 6,650 SF of new sidewalk along York Road (S.R. 0263) including 120 LF of concrete curb and 40 LF of concrete cheek wall. The Contract will also include 175 LF of 3-rail split rail fence, three shade trees, various relocation of signs, fencing, lights, mailboxes, etc., erosion and sedimentation controls, the modification of an existing concrete stairway, pavement restoration and the reconstruction of two landscape beds.

Award

Sidewalks / Parking Lot

$188,597.00

Public - County

Paving, Site Work

17

7

4

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
204
Bidding Soon
4,107
All Active Projects
1,914
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 10, 2024

img_map_placeholder

York Rd., Warwick Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.