Published May 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a civil project in Warwick Township, Pennsylvania. Completed plans call for the construction of a water / sewer project.

Contract No. 1 consists of construction of a new wastewater pump station, complete with precast concrete wet well and valve vault, new precast manholes, gravity sanitary sewer main, sanitary sewer force main, installation of new pumps, piping, valving, instrumentation, decommissioning and demolition of the existing wastewater pump station, general site restoration, and bypass pumping. Contract No. 2 consists of construction of a new electrical service and meter base, power and control raceway wiring, new generator and automatic transfer switch, panels, switches, miscellaneous electrical devices, wiring, instrumentation, and lighting. Note: The Owner intends to pre-purchase the ductile iron pipe, generator, and automatic transfer switch. Pre-purchased equipment and materials will be consigned to the contractor for installation. Bids must be on the forms furnished by the Owner. No bid will be considered unless it is accompanied by a certified check or bid bond in an amount not less than ten percent (10%) of the bid total. Such bid security shall be made payable to the Warwick Township Municipal Authority. All bid bonds shall be in the form included within the Bidding Documents and shall be accompanied by a power of attorney from a licensed surety company as described in the Bidding Documents. Bidders are advised that each bidder is required to submit with their bid a Non-Collusion Affidavit in the form contained in the Bidding Documents in accordance with the Pennsylvania Anti-Bid Rigging Act. Bidders are advised that each bidder is required to complete and submit with their Bid a Construction Contractor's Qualification Statement for Engineered Construction in the form contained in the Bidding Documents. Contracts for work under this bid will obligate the contractor and subcontractors not to discriminate in employment practices, and Bidder is required to complete and submit with their bid a Certification of Bidder Regarding Equal Employment Opportunity in the form contained in the Bidding Documents. Notice is given that the project for which bids are being solicited hereby is a project constituting public works and is subject to applicable provisions of the Pennsylvania Prevailing Wage Act, the Act of August 15, 1961, P.L. 987, as amended and supplemented, and appropriate prevailing minimum wage rates ad promulgated under the provisions of said Act must be paid by contractors in connection with performance of the necessary work. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Bidders should refer to the provisions of all federal and state statutes, rules, and regulations regarding the prevention of environmental pollution and the preservation of public natural resources that affect the project, and bidders will be required to comply with all such statutes, rules, and regulations. With respect to the contract, Owner shall award the contract to the lowest responsive and responsible bidder or shall reject all bids within sixty (60) days of the date of the bid opening, and no bidder may withdraw his bid before the expiration of such sixty (60) day period; provided, however, if the award of contracts is delayed by required approval of another government agency, required land acquisition, the sale of bonds, or the award of a grant or grants, the Owner shall reject all bids or award the contract to the lowest responsive and responsible bidder within one hundred twenty (120) days of the date of bid opening, and in such event no Bidder may withdraw his bid before the expiration of such one hundred twenty (120) day period. Extensions of the date for the award of the contract may be made by the mutual written consent of the Owner and the lowest responsive and responsible bidder. The Owner reserves the right, at its option, to waive any informalities, irregularities, defects, errors, or omissions in any or all proposals and to reject any or all proposals. Construction is anticipated to begin in November/December 2022.

Post-Bid

Water / Sewer

$1,200,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
149
Bidding Soon
2,225
All Active Projects
1,044
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

November 1, 2022

img_map_placeholder

To Be Determined, Warwick Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pump Station No. 13 Replacement Project - Contract No. 1 General/Process Mechanical, Contract No. 2 - Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.