EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a stadium in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a stadium.

Specifications include forms for the Eligible Business Opportunity Program. Form A-1 must be completed and submitted with the bid. Also, a Certificate of Compliance with the Substance Abuse Policy of the School District of Pittsburgh is included and must be completed and submitted with the bid. See the Specifications for additional forms which must be submitted with the bid. Each bid shall be signed, sealed and accompanied by a bid bond of an approved Surety Company licensed to do business in the Commonwealth of PA in an amount of not less than ten percent (10%) of the amount of the base bid proposal. Bond shall be drawn in favor of the School District of Pittsburgh. No Bidder may withdraw his or her bid for a period of One Hundred, Twenty (120) days after the date set for the opening of bids unless extended by the mutual written consent of the Contracting Body and the Bidder. Thirty (30) day extensions of the date for the award of the Contract may be made by the mutual written consent of the Owner and the Bidder. The School District of Pittsburgh reserves the right to waive any informalities in bids and to reject any or all bids. THE EBE PARTICIPATION GOAL FOR THIS PORTION OF THE PROJECT IS: 8% The successful bidder will be required to furnish and pay for satisfactory 100% performance bond, 100% payment bond, and enter into a No-Lien Agreement with the School District of Pittsburgh. Off-site work shall be started on the Project no later than ten (10) days after the execution of a Contract with the Owner or as otherwise directed in writing. On-site work shall start August 1, 2024. The work shall be substantially completed and ready for Owner use on September 27, 2024. Punch list items must be completed 30 days after substantial completion.

Award

Arenas / Stadiums

$390,000.00

Public - City

Renovation

8

15

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Closeout Submittals, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Battery Chargers
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
108
Bidding Soon
999
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

August 1, 2024

img_map_placeholder

800 E Carson St, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Fire Alarm System at Cupples Stadium

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.