BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000347162 The Work to be performed under the 2024 Water System Improvement Project consists of furnishing all labor, materials equipment, tools, and supplies including the installation of new water line replacement which covers approximately 11,210LF of 6, 8 & 12 diameter water distribution lines including valves, fittings, fire hydrants, and residential & commercial water service line re-connections at locations within the City of Aurora. This project is Aurora Water's annual program to replace water line in areas where elevated pipeline breaks have occurred. The issues related to the pipelines could be related to asset age, expansive soils, corroded pipe, installation defects, or defective appurtenances. Pipe replacement includes possible lead and galvanized water service replacement. Question Deadline 04/09/2024 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Zach Tredwell Torpie, Project Manager, at ztredwel@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. The Contract Documents require that all work be Substantially Complete by June 30, 2025 with Final Completion by July 15, 2025 Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. Liquidated Damages which are $2,000.00 per day. The estimated cost for this project is from $8,500,000.00 to $9,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City shall have the right to reject any and all Bids.

Post-Bid

Water / Sewer

$9,000,000.00

Public - City

Site Work

8

16

53

5

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
993
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 24, 2024

img_map_placeholder

Multiple Locations, Aurora, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.