Site work and paving for a road / highway in Mount Joy, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2024 Roadway Project - Contract No. 2 - Paving. The Contract No. 1 work will include, but not necessarily be limited to, approximately 8 locations for ADA curb ramps. The Contract No. 2 work will include, but not necessarily be limited to, approximately 14,100 SY milling, 11,400 SY paving fabric, 1,325 TON bituminous binder course, 1,955 TON bituminous wearing course, 1,400 SY roadway widening, and other work described in the contract. Contract No. 1 and 2 are subject to the following: the Pennsylvania Prevailing Wage Act conditions; the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, also known as the Underground Utility Line Protection Law, Act 287 of 1974, as amended; the Pennsylvania Human Relations Act 222 Condition; requirement of a noncollusion affidavit; the non-discrimination in Employment/Contract Compliance Regulations Conditions; and the Public Works Employment Verification Act. A certified check or bid bond for the amount of 10 percent of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. the non-discrimination in Employment/Contract Compliance Regulations Conditions; and the Public Works Employment Verification Act. Mount Joy Borough Council reserves the right to accept or reject any or all Bids. Question Deadline 04/19/2024 at 4:00 PM ET Only those questions submitted online via PennBID shall be considered. Questions received , regarding the project will not be acknowledged. Charter Lane: Donegal Springs Road to Cul-de-sac (Profile mill, paving fabric, base repair, leveling and wearing course) School Lane: Marietta Avenue to Pinkerton Road (Profile mill, paving fabric, base repair, leveling and wearing course) School Lane: Pinkerton Road to Delta Street (Roadway widening, milling - 4" depth, binder course, PA 2A leveling course, wearing course) 1. Mobilization and Demobilization (1 LS) 2. Traffic Control (1 LS) 3. Milling - profile mill full width, up to 2" depth (10,200 SY) 4. Milling - 4" Depth (3,900 SY) 5. Roadway widening - excavate 8" depth, dispose of excavated material, compact subgrade, complete in place (1,400 SY) 6. PA 2A Subbase, 8" Depth (1,400 SY) 7. Subbase Repair - excavate 8" depth, install class 4 geotextile, place and compact 8" depth AASHTO No. 1 stone, complete in-place (150 SY) 8. Base Repair: Sawcut, excavate 4" depth, remove material, place 4" depth, Superpave Asphalt Mixture Design Binder Course, 25 mm, PG 64S-22, 0.3 to 30 million ESALs, complete in place (880 SY) 9. Base Repair Subbase: Excavate 8" depth, furnish and place 8" PA 2A subbase, complete in place (880 SY) 10. Regrade and compact milled and widened roadway (5,300 SY) 11. Pavement removal, remove existing pavement beyond the edge of the proposed road, 4" depth, complete in place (460 SY) 12. PA 2A Aggregate Leveling Course (550 TON) 13. Paving Fabric, complete in place (11,400 SY) 14. Superpave Asphalt Mixture Design Binder Course, PG 64S-22, 0.3 to 30 Million ESALs, 25 mm, 4" depth, complete in place (1,325 TON) 15. Superpave Asphalt Mixture Design Leveling Course, PG 64S-22, 0.3 to 3.0 Million ESALs, 9.5 mm, SRL - L, complete in place (485 TON) 16. Superpave Asphalt Mixture Design Wearing Course, PG 64S-22, 0.3 to 3.0 Million ESALs, 9.5 mm, 1.5" depth, SRL - M, complete in place (1,470 TON) 17. Topsoil, seed and mulch along edge of new paving, complete in place (750 SY) 18. Thermoplastic White Crosswalk Line, 6" line width, complete in place (228 LF) 19. Eradicate existing conflicting pavement markings (64 LF) 20. Manhole frame and cover adjustment - saw cut, excavate to existing manhole cone section, remove existing frame, cover and adjustments, provided concrete grade adjustment rings, install existing frame and cover, place PA 2A subbase, up to 10" depth, Superpave Asphalt Mix Binder Course, 25mm, PG 64S-22, 0.3 to < 30 Million ESALs, 6" depth (14 EA) 21. Manhole frame and cover replacement - saw cut, excavate to existing manhole cone section, remove existing frame, cover and adjustments, provided concrete grade adjustment rings, install new frame and cover, place PA 2A subbase, up to 10" depth, Superpave Asphalt Mix Binder Course, 25mm, PG 64S-22, 0.3 to < 30 Million ESALs, 8" depth (5 EA) 22. Water valve box adjustment - saw cut, excavate, provided valve box extension, Superpave Asphalt Mix Binder Course, 25mm, PG 64S-22, 0.3 to < 30 Million ESALs in excavated area (10 EA) 23. 15" Diameter HDPE Storm Sewer, complete in place (200 LF) 24. Type M Inlet (1 EA) C. CONTRACTS 1. Project will be constructed under a general construction contract.. The Contract No. 1 work will include, but not necessarily be limited to, approximately 8 locations for ADA curb ramps.

Award

Roads / Highways

$559,200.00

Public - City

Paving, Site Work

10

17

2

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
247
Bidding Soon
3,459
All Active Projects
1,472
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 25, 2024

May 27, 2024

img_map_placeholder

Multiple Locations, Mount Joy, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.