BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Saginaw, Michigan. Completed plans call for the renovation of a educational facility.

According to drawings and specifications as prepared by WTA Architects and the Construction Manager's Project Manual, as prepared by Spence Brothers. The project will consist of Saginaw Township Community Schools, 2024 Boiler & AHU Replacement, Bid Pack #1 - Boilers. Construction will begin June 2024 and be completed in August 2024. Bid proposals shall be received from invited contractors only via Procore. All other contractors and suppliers shall submit their bids to invited contractors. Bid proposals will be opened publicly. Fax and email bids are unacceptable. When submitting your proposal via Procore you MUST attach a scanned copy of the bid form and the Statement of Familial Disclosure provided by the Construction Manager. No bids will be accepted at the office of the Owner, Construction Manager or the Architect. All bids received after the bid due time on the bid due date will not be accepted and will be returned to the Bidder. Bidder will be notified if their bid was received late. The Construction Manager is utilizing Procore's project management software as the repository for all bid documents, construction documents, and related correspondence for this project. This includes, but is not limited to, notices, drawings, specifications, project manuals, addenda, bid clarifications, etc. It is each bidder's responsibility to ensure they retrieve any and all bid documents issued for this project. All questions need to be submitted to the Construction Manager, Erica Meisel at Ericameisel@spencebrothers.com. All questions must be submitted in writing no later than April 4, 2024. No direct contact with the Owner, Architect, or consulting Engineers is permitted. All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. The Owner, Architect, and Construction Manager reserve the right to accept and/or reject any or all bid proposals and to waive any and all informalities and/or irregularities in bid proposals submitted. This right shall be exercised at the sole discretion of Saginaw Township Community Schools. Spence Brothers will make awards as may appear to be in the best interest of Saginaw Township Community Schools. A Bid Security by a qualified surety authorized to do business in the State where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are NOT acceptable. Bids may not be withdrawn for a period of sixty (60) days after the bid date. Bidders will be required to furnish the cost of Performance and Payment Bonds in the amount of 100% of their bid. The cost of the Bond shall be included on each proposal form separate from the base bid. The Construction Manager will direct, supervise, coordinate, and manage the project. Overall administration of the Project will be the responsibility of the Construction Manager, Spence Brothers. The Construction Manager will award contracts for separate bid divisions or combinations of bid divisions. All bids shall be submitted on the bid proposal forms provided in the Construction Manager's Project Manual, completely filled in, and executed.

Post-Bid

Educational

$370,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
145
Bidding Soon
1,913
All Active Projects
754
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 9, 2024

June 3, 2024

August 19, 2024

img_map_placeholder

Multiple Locations, Saginaw, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.