BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a military facility.

As of May 10, 2024, an awarded General Contractor has been identified. They are seeking additional HVAC and electric pricing due by May 24, 2024 at 2:00 PM. Construction is expected to start July 1, 2024 and take approximately six months to complete. The previous solicitation is listed below for reference. Added new version of Solicitation under attachments. This update includes information regarding bid guarantees clause, FAR 52.228-1. General Decision Number: OK20230049 A secondary site visit will be held on 23 April 2024 at 0900 CDT at WRANGB, OK. Please coordinate with the above contacts to attend. Please review all information and contact us if you have any questions. Any questions, please contact SMSgt Kyle Thomas, kyle.thomas.24@us.af.mil or, Maj Ryan Moehle, ryan.moehle@us.af.mil, or A1C Grace Heilaman, grace.heilaman@us.af.mil Posted slideshow from pre-bid site visit with pertinent information. Please review and contact if you have any questions. Pre-bid RFIs will be due no later than 24 Apr 2024 @ 1000 CDT. The 137th SOCES requires a renovation project that includes the installation of additional cooling in existing COMM rooms in the buildings designated in the Statement of Work to accommodate the additional heat load generated by the servers. The purpose of this project is to install new , or upgrade existing, mini split cooling systems in these rooms to prevent overheating of the communications equipment. Please see the Statement of Work (SOW), Drawings, Specifications, and Wage Determination for further information. This project is 100% Small Business set-aside, NAICS 236220, Magnitude is between $25,000 and $100,000. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office. Subject Line: Reference No. SOLICITATION W50S8T-24-B-0001 Email: kyle.thomas.24@us.af.mil and ryan.moehle@us.af.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The communications nodes located in the 5 rooms identified within this scope of work are not consistently being cooled enough to prevent damage to the equipment operating in them. The purpose of this project is to install new, or upgrade existing, mini split cooling systems in these rooms to prevent overheating of the communications equipment.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

11

17

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
45
Bidding Soon
682
All Active Projects
292
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2024

July 1, 2024

January 31, 2025

img_map_placeholder

Multiple Locations, Oklahoma City, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.