Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Scope of Services Install 1,650 LF of 8" DIP and all appurtenances. Renew 101 inlet services. 1. Please note that documentation of pressure and leakage testing in accordance with GW Specification Section 4-15 will be required. 2. Project to be under construction within 2 weeks of issuance of contract unless otherwise communicated with GW and Engineering Department. 3. Seven (7) compaction tests required at locations to be specified by GW Inspector. 98% compaction required under paved surface and 95% compactionrequired along ditch sections per Permit Specs. Percent compaction, percent moisture, wet density, and dry density to be provided with compaction report. 4. Contractor required (per Encroachment Permit Specs) use screenings on roadway if placing excavated spoils on road surface. 5. Performance Bonds and Payment Bonds on GW standard forms required with GW Contract. 6. All items related to Milling and Full Width Resurfacing, as outlined in the encroachment permits, is part of this contract. 7. Unless noted, all work shown on drawings is require whether or not a specific bid item is listed. Payment for work for which a bid item is not listed shall be included as part of other bid items. 8. Retainage of 10 percent will be deducted from each pay request until project completion and final acceptance of all work performed. 9. Within 10 days of written notice of acceptance of this bid, Contractor will execute the contract and deliver the bonds and insurance certificates to GW. 10. Contractor will be required to flush the mains p e r t he c on stru c tio n no t es as required by GW. Contractor will also be required to furnish and install flow meter prior to flushing. 11. If awarded large taps and tap-overs the Contractor will be required to attend GW Tap Training prior to performing any taps. Contractor will also be required to submit pictures of all large taps; all service line taps and all tap-overs prior to meter box installation. If large taps and tap overs are not performed correctly and as instructed during tap training the Contractor will not be allowed to perform large taps and tap-overs on this project or future projects. GW will decide which alternate bid items will be installed by Contractor or will be installed by GW for all alternate bid items. 12. Contractorshall submit the two attached affidavits with his bid: Ethics in Public Contracting Af idavit Non-collusion Af idavit of Prime Bidder 13. Contractor will be required to sign a GW release and waiver of lien before final payment is made. 14. Failure to complete all work by August 1st 2024, date will result in liquidated damages in the amount of $500 per calendar day. Liquidated damages will be deducted from pay requests. 15. It will be the responsibility of the contractor to ensure that the required notice permit provided is on the job site at all times during work. 16. Any US Pipe from Lynchburg, VA used on job site will only be accepted if cut sample meets minimum AWWA concrete liner thickness requirements. One piece per batch to be cut for field inspector to verify if requirements are met. 17. Contractor to begin construction on Druid St. (GV), followed by Windsor Dr (GV), and Perry Rd. (S-23-188). Construction not to impede Greenville City or SCDOT Repaving. Either Reid St. (GV) and Tabor St. (GV) can be replaced after Perry Rd. 18. Perry Rd. (S-23-188) must be completed by August 1 st 2024 per DOT Permit. Work not completed will be removed from the project and omitted from the final invoice.

Post-Bid

Water / Sewer

$2,250,000.00

Public - City

Site Work

11

10

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
35
Bidding Soon
695
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Greenville, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.