BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

PROJECT REQUIREMENTS: 1. Please note that documentation of pressure and leakage testing in accordance with GW Specification Section 4-15 will be required. 2. Project to be under construction within 2 weeks of issuance of contract. 3. Sixteen (16) compaction tests required at locations to be specified by GW Inspector. 95% compaction required under paved surface and 90% compaction required along ditch sections. 4. Contractor required (per Encroachment Permit Specs) use screenings on roadway if placing excavated spoils on road surface. 5. Performance Bonds and Payment Bonds on GW standard forms required with GW Contract. 6. All items related to Milling and Full Width Resurfacing, as outlined in the encroachment permits, is part of this contract. 7. Unless noted, all work shown on drawings is required whether or not a specific bid item is listed. Payment for work for which a bid item is not listed shall be included as part of other bid items. 8. Retainage of 10 percent will be deducted from each pay request until project completion and final acceptance of all work performed. 9. Within 10 days of written notice of acceptance of this bid, Contractor will execute the contract and deliver the bonds and insurance certificates to GW. 10. Each bid must be accompanied by cash, certified check of the bidder, or a Bid Bond prepared on the form of bid bond attached hereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of five percent (5%) of the bid. Cash or checks will be returned to all except the three lowest bidders within three 11.Contractor shall submit the two attached affidavits with his bid: Ethics in Public Contracting Affidavit Noncollusion Affidavit of Prime Bidder. 12. Contractor will be required to sign a GW release and waiver of lien before final payment is made. 13. Failure to complete all work by within 180 calendar days of the Notice to Proceed (which will be negotiated with the winning bidder and based on pipe delivery dates), will result in liquidated damages in the amount of $500 per calendar day. Liquidated damages will be deducted from pay requests 14. This project will be done in conjunction with a metroconnects sewer rehabilitation project. The contractor will make all efforts to coordinate with metroconnects and their contractor to ensure that work for Greenville water being performed in areas that overlap is completed before metroconnects paves the roads. Type of Award: Lump Sum Bid Bond 5.00% Pre-Bid Meeting: No Online Q&A: No Contact Info Kevin Gravelle 864-241-5008 kgravelle@greenvillewater.com

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

6

7

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
104
Bidding Soon
1,130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 25, 2024

Project location map

Multiple Locations, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.