Published May 6, 2024 at 8:00 PM

Updated May 7, 2024

Site work and paving for a mixed-use development in Marion, Iowa. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The general nature of the work on which bids are requested is: Install 60 LF of 6" PVC Water Main, 30 LF of 8" PVC Water Main and 1,360 LF of 12" PVC along existing water main in Tama Street and along Marion Boulevard. Project also includes removal of sidewalk/driveways and miscellaneous related work and appurtenances in accordance with the contract documents. Engineer's Estimate: $244,690.00. 5% bid bond For plans or project questions contact: Todd Steigerwaldt, PE General Manager 319.743.6311 tsteigerwaldt@cityofmarion.org Work shall be completed by December 13th , 2024. Liquidated damages in the amount of $200.00 per day will be assessed for each day in excess of these schedules. The project may be suspended for spring hydro-seeding if needed but all other work shall be completed by December 13 th , 2024. Work shall be completed by December 13th , 2024. Liquidated damages in the amount of $200.00 per day will be assessed for each day in excess of these schedules. The project may be suspended for spring hydro-seeding if needed but all other work shall be completed by December 13 th , 2024. Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the Marion Water Board of Trustees and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor and protect and save harmless the City/Water Department from claims and damages of any kind caused by the operations of the contract.Upon completion of the project and before final acceptance by the Marion Water Board of Trustees, the contractor will be required to post a 2-year maintenance bond. The City of Marion Water Department reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after receipt of bids, and no bid may be withdrawn during this period.

Bid Results

Water / Sewer

$244,690.00

Public - City

Paving, Site Work

10

5

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
95
Bidding Soon
1,139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

Project location map

Tama St SE, Marion, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.