Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2024 at 8:00 PM

Updated May 30, 2024

Site work for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a municipal facility; road / highway; and water / sewer project.

The anticipated start date of the project will be shortly after contract signing. The substantial completion date shall be by September 1, 2025. Reference the Technical Specifications Section 1.5 (Work Sequence) as some work shall be completed in 2024 and some work in 2025. Scope of Work The scope of work is per the specifications developed by SCS Engineers. Reference the following for the scope - Technical Specifications Project #25223132.02 titled Phase 1 Construction Outagamie County Northwest Landfill (157 pages) Construction Drawings, Phase 1 Liner Construction Outagamie County Northwest Landfill dated February, 2024 (30 pages) Also reference the following related to the project: Soil Boring Log Information from drilling on 8/14/2017 (26 pages) Each bid submitted must be accompanied by a bid bond prepared on the surety's standard form duly executed by the bidder as principal and having as surety thereon a surety company licensed in the State of Wisconsin, in the amount of five percent (5%) of your total bid price, payable to the owner as a guarantee that if the bid is accepted, the successful bidder will execute and file with the owner within ten (10) business days from the date the lowest responsible bidders bid is accepted, the required insurance certificate, a performance bond and a labor and material payment bond, for the faithful performance of this project, and for the complete payment of all persons either performing labor or furnishing materials for the completion of this project. If the bidder fails to file such certificate and bonds within ten (10) days from the acceptance, the bid security shall be forfeited to the owner as liquidated damages. If you submit more than one bid, you need only to submit one bid bond in the amount of five percent (5%) of your highest bid price. Attorney's-in-fact who sign bid bonds, performance bonds, labor and material payment bonds must file with each bond a certified and currently dated copy of their power of attorney. Failure to submit a bid bond will result in the rejection of your bid. Outagamie County reserves the right to request clarifications for any bid.

Bid Results

Municipal

$6,026,502.00

Public - County

Site Work

32

16

4

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
42
Bidding Soon
892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

May 24, 2024

Project location map

1419 Holland Rd, Appleton, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed