BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Saint Charles, Missouri. Design plans call for the construction of a municipal facility; 600,000-square-foot clubhouse / community center; fitness / recreation center; museum; and restaurant.

St. Charles Proposition C was approved by voters on April 2, 2024, to create a new "City Centre" complex with a new City Hall and other facilities at the former American Car Foundry property. As envisioned by city officials, the project would link the historic Main Street District with the Frenchtown historic district. In addition to a new City Hall, the project will build a Historical Society office, a Senior Center with a recreation center included, offices for Sister Cities International and an arts and cultural center with restaurant incubators. As of September 12, 2024, project is in design phase. The site of the proposed project, the former American Car Foundry, consists of buildings with more than 600,000 square feet along the banks of the Missouri River. The Foundry Art Centre already operates out of the site, which was a former train car factory that operated since the 1870s and closed in 1959 due to lower demand for trains. The arts center opened in 2004. The city center complex would house the city hall, providing extra office space, and an expanded historical society. The complex would include updated fire-suppression systems to promote safety. The city would consolidate services for residents to a single floor, increasing accessibility and convenience. Plans include a separate building that would house the redesigned senior center. The senior center will also feature a rec center component. The city would use the same building to create council chambers separate from city hall for public meetings and events. The complex would feature other community amenities, including an arts and cultural center, daycare and Sister Cities International offices. Mixed-use developments such as apartments and restaurants will complement the area. The city would build the complex at the American Car Foundry property, providing direct connections between the historic main street district and Frenchtown cultural hubs. The complex would include a connected parking garage. Plans include walkways throughout the complex that connect with the nearby Katy Trail.

Design

Municipal

$85,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
107
Bidding Soon
1,480
All Active Projects
644
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2025

img_map_placeholder

To Be Determined, Saint Charles, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.