Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and renovation of a water / sewer project in Orlando, Florida. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of November 5, 2025, an engineer has been selected, and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Engineering Consultant (Consultant) shall assist the Central Florida Tourism Oversight District (CFTOD or DISTRICT) by providing professional engineering services in the design, bidding, permitting, and construction phase services for the process improvements to the condenser water and cooling tower systems associated with the chilled water plant. The improvements will be located at the EPCOT Energy Plant (EEP), 751 Backstage Lane, Lake Buena Vista, Florida. The existing condenser water and cooling tower system includes four (4) cooling towers with associated pumps, valves, piping, and chemical control. Cooling towers 1-3 are original to the construction of the EEP in the 1980’s and are connected via a common condenser water pump sump. In 1989 cooling tower 4 and associated pumps, valves, and piping were added. Upgrades are needed to improve the ability to isolate individual towers for maintenance and flexibility in operation. Refer to Appendix A and B. Requested improvements include: 1. Modify, install, test and commission a chemical treatment system for cooling tower cell 4 to include piping and controls as needed. 2. Design/specify, install, test and commission electronically operated chemical valves for each cooling tower cell to operate in conjunction with the associated cells over tower valve (OTV). 3. Design/specify the repair of structural concrete damage within the basin of cooling tower cell 4. 4. Design/specify a solution using sluice gates to close existing openings between cooling tower cells 3 and 4, construct one (1) larger opening between the cells, and install means of mechanical isolation of new opening. 5. Design/specify, install, test and commission a second condenser water piping header from existing chillers to existing condenser water header to include piping, valves, hangars, and other appurtenances. 6. Design/specify, install, test and commission isolation valves in existing condenser water header. 7. Design/specify, remove existing, install, test and commission new flowmeters for each cooling tower condenser water flow. License Requirements Florida-registered P.E. Q&A Deadline 04/02/2024 6:00 PM (EDT) Online Q&A Yes Project Duration Design Phase (168 days) Construction Phase (335 days)
Design
Water / Sewer
$915,000.00
Public - County
Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
751 Backstage Ln, Orlando, FL
Related To This Project
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.