BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Orlando, Florida. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Engineering Consultant (Consultant) shall assist the Central Florida Tourism Oversight District (CFTOD or DISTRICT) by providing professional engineering services in the design, bidding, permitting, and construction phase services for the process improvements to the condenser water and cooling tower systems associated with the chilled water plant. The improvements will be located at the EPCOT Energy Plant (EEP), 751 Backstage Lane, Lake Buena Vista, Florida. The existing condenser water and cooling tower system includes four (4) cooling towers with associated pumps, valves, piping, and chemical control. Cooling towers 1-3 are original to the construction of the EEP in the 1980’s and are connected via a common condenser water pump sump. In 1989 cooling tower 4 and associated pumps, valves, and piping were added. Upgrades are needed to improve the ability to isolate individual towers for maintenance and flexibility in operation. Refer to Appendix A and B. Requested improvements include: 1. Modify, install, test and commission a chemical treatment system for cooling tower cell 4 to include piping and controls as needed. 2. Design/specify, install, test and commission electronically operated chemical valves for each cooling tower cell to operate in conjunction with the associated cells over tower valve (OTV). 3. Design/specify the repair of structural concrete damage within the basin of cooling tower cell 4. 4. Design/specify a solution using sluice gates to close existing openings between cooling tower cells 3 and 4, construct one (1) larger opening between the cells, and install means of mechanical isolation of new opening. 5. Design/specify, install, test and commission a second condenser water piping header from existing chillers to existing condenser water header to include piping, valves, hangars, and other appurtenances. 6. Design/specify, install, test and commission isolation valves in existing condenser water header. 7. Design/specify, remove existing, install, test and commission new flowmeters for each cooling tower condenser water flow. License Requirements Florida-registered P.E. Q&A Deadline 04/02/2024 6:00 PM (EDT) Online Q&A Yes Project Duration Design Phase (168 days) Construction Phase (335 days)

Conceptual

Water / Sewer

$915,000.00

Public - County

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
72
Bidding Soon
1,532
All Active Projects
649
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.