BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in West Bridgewater, Massachusetts. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

New Building to House a Pair PFAS Filter Vessels Adjacent - GC The work of this contract generally consists of the construction of a new building to house a pair PFAS filter vessels adjacent to the existing Manley Street Water treatment plant. The work includes, but is not limited to: new above and below ground pipe and fittings, chemical feed systems and pumps, replacement of two submersible wells pumps at the Manley Wells, iron and manganese filter media replacement and piping within the existing vessels, vessel disinfection and modifications, as well as associated electrical, instrumentation, and SCADA upgrades. Contractor Qualification DCAMM Certificate Disadvantaged Business Enterprise (DBE) goals are applicable to the total amount paid for the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs. Each bid and sub-bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond, each in the amount of 100% of the Contract Price, will be required. Massachusetts Minimum Wage Rates as well as Federal Minimum Wage Rates apply to this project. This project is being funded in part by the Massachusetts Clean Water Trust (the "Trust"). Only bids submitted by prequalified bidders in accordance with M.G.L. c. 149, 44D 1/2 , subsections (a) to (j) inclusive, and sub-bids submitted by prequalified sub-bidders in accordance with M.G.L. c. 149, 44D 3/4 , subsections (a) to (j) inclusive, will be accepted. Question Deadline 04/26/2024 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer. Questions received less than five business days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$3,733,605.00

Public - City

New Construction, Site Work

46

28

33

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
193
Bidding Soon
2,526
All Active Projects
1,170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

July 1, 2024

img_map_placeholder

8 Manley St, West Bridgewater, MA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.