Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Whiteriver, Arizona. Completed plans call for the renovation of a medical facility.
23 APR 24: Updated WRSU Panel Upgrade Introduction to extend due date. Operating Room isolation panel upgrade. 27 MAR 24: Updated WRSU Panel Upgrade Introduction to include site visit restrictions and add secondary POC. This project shall include but not be limited to replacing the Operating Room 2 (OR2) 277-volt isolation panel with a new 480-volt/120-volt isolation panel. Electrical wiring, drywall demolition, drywall patching/repair, painting, and Class IV infection control. See Attachment A for the WRSU Infection Control Policy. If you have any questions, please submit Request for Information (RFI) to Dale C Clark via email @ dale.clark@ihs.gov by 19 APR 24, 1:00 PM MST. RFIs submitted after 19 APR 24 will not be considered. SCOPE OF WORK This project shall include but not be limited to replacing the Operating Room 2 (OR2) 277-volt isolation panel with a new 480-volt/120-volt isolation panel. Electrical wiring, drywall demolition, drywall patching/repair, painting, and Class IV infection control. See Attachment A for the WRSU Infection Control Policy. A. Electrical The electrical scope shall include but is not limited to upgrading the isolation panel, wiring, conduit, breaker, and reconfiguring isolation branch circuits. 1. Isolation Panel: Upgrading the existing obsolete 277-volt/120-volt Post Glover model SFP5/41/846/GLN isolation panel with a new 480-volt/120-volt PG Lifelink Plus Series IPP-P 5 kVA isolation panel (or approved equivalent). The replacement isolation panel shall be flush mount with six (6) hospital grade red panel receptacles, four (4) ground jacks, five (5) factory installed circuit breakers for branch circuit, and line isolation monitor as outlined in specifications at Attachment B. 2. Breaker: The 277-volt breaker shall be upgraded to a 480-volt breaker per NEC 70. Space is available in the electrical panel. 3. Wiring & Conduit: The wiring and conduit shall be upgraded per NEC 70. The existing OR2 isolation panel is not fully supported by an uninterruptable power supply (UPS). The new OR2 isolation panel circuit shall be reconfigured to be fully supported by a recently installed Eaton 93PM UPS. The final connections to the Eaton UPS shall be 10' of SO cord type for the input and 10' of SO cord for the output allowing the UPS to be serviced. See Attachment C for panel locations. 4. Branch Circuits: The two isolation panel branch circuits currently tied to the obsolete isolation panel breaker labeled "Panel Receptacle #3" shall be reconfigured to be powered from individual isolation panel branch circuits. B. Drywall/PaintingThe existing isolation panel measures 49"H x 44.5"W x 10"D and the new isolation panel measures 70"H x 24"W x 6"D requiring drywall work and painting. The existing paint shall be matched and the entire wall containing the isolation panel shall be painted. Contractor shall verify all quantities and dimensions.
Post-Bid
Medical
$100,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2024
June 10, 2024
200 W Hospital Dr, Whiteriver, AZ
Related To This Project
Whiteriver, AZ
Bid Date: Jun 10 2021
Whiteriver, AZ
Bid Date: May 28 2024
Whiteriver, AZ
Bid Date: Jul 31 2024
Whiteriver, AZ
Bid Date: Jul 26 2024
Whiteriver, AZ
Bid Date: Sep 05 2024
Whiteriver, AZ
Bid Date: Sep 06 2024
Whiteriver, AZ
--
Whiteriver, AZ
--
Whiteriver, AZ
Bid Date: Mar 06 2024
Whiteriver, AZ
Bid Date: Feb 27 2024
Whiteriver, AZ
Bid Date: Feb 27 2024
Whiteriver, AZ
--
Whiteriver, AZ
Bid Date: Nov 30 2023
Whiteriver, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.