EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2024 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Wheaton, Illinois. Contact the soliciting agency for additional information.

Each Proposer shall provide a Bid Bond/Bid Deposit of 10% of the full Contract price. If a Bid Bond (preferred), an original shall be submitted with the bid. If in the form of a certified check or a bank cashier's check, it is made payable to the City of Wheaton. Checks will be retained by the City until an award is fully executed, at which time the checks will be promptly returned to the unsuccessful Bidders. All questions, either administrative or technical, shall be submitted via email to Tina Walters, Procurement Officer at twalters@wheaton.il.us no later than April 10, 2024, at 11:00 am (CST). The initial term of the contract shall be for five (5) years effective October 1, 2024, and ending September 30, 2029. The contract term may be extended through mutual agreement between the City and the Service Provider. Each Proposer shall provide a Bid Bond/Bid Deposit of 10% of the full Contract price. If a Bid Bond (preferred), an originalshall be submitted with the bid. If in the form of a certified check or a bank cashier's check, it is made payable to the City of Wheaton.

Post-Bid

Residential Subdivision

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
174
Bidding Soon
2,220
All Active Projects
1,081
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

May 24, 2024

img_map_placeholder

Multiple Locations, Wheaton, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Residential Solid Waste Collection and Disposal Service

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.