Demolition, site work, paving and new construction of a bridge / tunnel in Wheaton, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project consists of the replacement of the wooden decking and railings and the cleaning and painting of the steel substructure of the existing bridge over the West Branch of the DuPage River in Mallard Lake Forest Preserves. Consideration of contract award will likely be made on May 16, 2024 Minority business firms are encouraged to submit bids on the project and successful contract bidders are encouraged to utilize minority businesses as subcontractors for supplies, equipment, services and construction. The Forest Preserve Commission reserves the right to reject any or all bids and to waive technicalities. Bid Bond 10% Deadline for Questions / Request for Information 4/29/2024 5:00 p.m. Via e-mail to: cwelch@dupageforest.org Or phone 630-871-6411 SUBSTANTIAL COMPLETION It is anticipated that the CONTRACTOR will begin Work June 30, 2024 and the project shall be substantially completed by August 30, 2024. Substantial completion shall consist of completing all Work under Contract. Within 7 days after the date of substantial completion, the Owner will furnish the Contractor with a punch list specifying the items that need to be completed or corrected. The Contractor shall complete all items on the punch list by September 20, 2024, or within such time as may be allowed by extensions approved by the Owner. Unless approved by the Owner, a time extension will not be given due to weather unless the Contractor submits a claim in writing showing documentation from the National Weather Service that the weather during the contract time was unusually severe versus the previous ten (10) years recorded. FINAL COMPLETION Contractor shall complete all the items on or before Final Completion date of September 27, 2024

Bid Results

Bridges / Tunnels

$358,200.00

Public - County

Demolition, New Construction, Paving, Site Work

7

5

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
243
Bidding Soon
3,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 30, 2024

Project location map

To Be Determined, Wheaton, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.