BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Toledo, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Local - Local Business Project Duration 120 days Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Q&A Deadline 04/10/2024 2:00 PM (EDT) Scope of Services This project will add left and right turns lanes into Llama Lane on the Anthony Wayne Trail. This includes adding turn lanes along with removing and replacing the pavement as well as pedestrian ramp improvements. The project also includes pavement striping, structure adjustments, overhead lane line control and concrete pedestrian ramps where required. City forms must be filled out and attached to the bid: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Suspension and Debarment; Primary and Subcontractor Forms; Best Bid Criteria; Signed Contract by Vendor CEO/President ; MBE Participation form; Certificates of Insurance; Current Worker's Compensation Certificate; Court-Ordered Child Support Affidavit; Independent Contractor PERS forms; and additional Insurance as Required. The following items will be required prior to awarding the contract: PLA paperwork is due upon award.

Bid Results

Sidewalks / Parking Lot

$1,104,072.00

Public - City

Paving, Site Work

20

7

4

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
70
Bidding Soon
1,272
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

June 17, 2024

img_map_placeholder

Anthony Wayne Trl, Toledo, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.