BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Greenwich, Connecticut. Completed plans call civil work for a dam / floodwall.

Project scope includes but is not limited to improvements to existing reservoir dam. Question Deadline 04/10/2024 XISTING SYSTEM DESCRIPTION A. Brush Reservoir Dam is a concrete dam with a broad crested concrete overflow spillway weir at the left abutment. The dam is a Moderate Hazard (Class BB) dam. The dam is anticipated to overtop by approximately 0.8 feet during the 100-year design storm event. The dam is approximately 243 feet long and up to 23 feet high. The spillway has approximately 2.5 feet of normal freeboard and is 30 feet in length. The upstream and downstream faces are covered by a failing shotcrete surface, and the crest has a bituminous overlay. The dam has two inoperable intake valves, one low-level outlet and one raw water line. The impoundment is a former water supply reservoir that serves to store a relatively small volume of water that discharges to Gray's Pond Brook and conveys flow to Bargh Reservoir (an active drinking water reservoir). The Work includes, but is not limited to, the following major items: a. Install erosion and sedimentation controls. b. Install construction access road. c. Clear and grub trees, stumps, and brush within 25 feet of the dam. d. Implement and maintain control of water. e. Demolish existing training walls, spillway weir, and portions of dry stack stone masonry road walls. f. Demolish existing valve operators and corbels. g. Demolish top 2.5 feet of dam crest and install 1.5 feet of new concrete cap. h. Demolish existing dam concrete to bedrock where detailed on plans. i. Demolish upstream shotcrete facing and unsound concrete. j. Excavate fill, remove rock and pour concrete for the spillway channel. k. Install reinforced spillway concrete. l. Install new reinforced concrete training wall to form the right side of the spillway channel and left boundary of the downstream rip rap buttress. m. Install upstream concrete repairs and waterproofing. n. Install downstream rip rap buttress. o. Install upstream rip rap at new spillway section. p. Extend downstream 20-inch low-level outlet pipe, fittings, and install outlet end section. q. Abandon and plug existing raw water line through dam. r. Install low-level outle

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Renovation, Site Work

66

20

11

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
867
Active Projects
502
Bidding Soon
6,866
All Active Projects
2,803
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 15, 2024

May 15, 2024

September 13, 2024

img_map_placeholder

Barn Hill Rd, Greenwich, CT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.