EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Batavia, Illinois. Completed plans call for the construction of a laboratory facility; for site work for a laboratory facility; road / highway; for paving for a road / highway; and water / sewer project.

60633857, 6-15-12 Addendum 21 is issued 1/24/2025 to incorporate questions and responses. Related Notice- LBNF-ND-350921-BWQ Addendum 14 is issued 10/29/2024 to incorporate document revisions and questions and responses. Addendum 13 is issued 10/11/2024 to incorporate questions and responses. Addendum 4 is issued 8/1/2024 to incorporate updated information on funding and milestones. Please see the re-issued RFP Letter for anticipated amounts. Additionally this addendum removes the "draft" designation from the documents. The draft RFP contains Instructions to Offerors, Drawings, Specifications, and the Sample Subcontract including applicable documents. Funding Availability and Subcontract Milestones will be provided prior to the Pre-Proposal Meeting. DESCRIPTION FRA expects to select one subcontractor to perform construction services of the Near Detector Complex as required by the LBNF/DUNE-US Project, NSCF at Fermilab under a Firm Fixed Price (FFP) Subcontract. The work shall include all services, labor, material, tools, equipment, excavation, shoring, testing, inspection, and all necessary General Conditions Work that is required by or may be reasonably inferred from the Subcontract documents to provide general contractor construction work for the project. Refer to the Reference Drawings and Technical Specifications in Packages 2 and 3 for more information. The NSCF Near Detector Complex Construction scope includes a service building, primary and secondary shafts, detector cavern, and site improvements including access road improvements, an equipment yard, a hardstand, and utilities that will house and support the LBNF Near Detector. The proposals shall be valid up to the anticipated award date, which is 7 months from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP. MANDATORY PRE-PROPOSAL CONFERENCE Offerors are required to attend a Pre-Proposal Conference and to inspect the work site on Wednesday, July 10, 2024, starting at 10:00 AM Central Time. FRA will present information about the project, which should be of interest to all Offerors. The conference will be held in the CDF Building 327 conference room. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated. Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than 5:00 PM Central Time on Wednesday, June 26, 2024, of the number and name of persons who will attend the site inspection, including any lower tier subcontractors, and the company they will be representing. OFFERORS' QUESTIONS Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request in writing by close of business (5:00 PM), August 15, 2024. Questions submitted after this date may not be answered prior to the proposal's due date. Questions must be submitted by email to bquinn@fnal.gov. Answers to questions that are germane to the interpretation of FRA's requirements will be issued to all offerors via addendum, ensuring that the identity of offerors submitting the questions will remain anonymous. Addendum 1 is issued 6/21/2024 to incorprate document revisions, access information for Pre-Proposal Conference, and questions and responses. Addendum 2 is issued 7/09/2024 to incorporate questions and responses, information on funding and milestones, and supplemental documents pertaining to a Sample Small Business Subcontraction Plan Template and FRA Illinois Sales Tax Exemption Certificate. Addednum 3 is issued 7/26/2024 to incorporate questions and responses, sign-in sheets and presentation slides from the 7/10/2024 Pre-Proposal Conference, an updated ES&H document, and extends the due date for questions to 8/15/2024 and the due date for proposals to 9/16/2024.

Post-Bid

Laboratories

$20,000,000.00

Public - Federal

New Construction, Paving, Site Work

340

64

248

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Lighting, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, Vibration and Seismic Controls for Fire-Suppression Piping and Equipment, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Fans, Axial HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Indoor Central-Station Air-Handling Units, Modular Indoor Central-Station Air-Handling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Concrete Raising, Pressure Grouting, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining, Tunnel Excavation, Tunnel Excavation by Tunnel Boring Machine
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Bridge Cranes, Hoists, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas Handling Jet Pumps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
139
Bidding Soon
2,290
All Active Projects
1,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 18, 2025

img_map_placeholder

To Be Determined, Batavia, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fermilab LBNF NSCF Construction - Near Detector Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.