Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Hermitage, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
This is a transportation alternative project including milling, paving, pipe replacement, driveway adjustments, line painting, sidewalk repair, and base repair, as indicated on the approved drawings included in the bid package for an STU project on Kelly Road in Hermitage, Mercer County. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Hermitage 2022 STU Grant - Kelly Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$584,617.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2024
July 15, 2024
Kelly Rd, Hermitage, PA
Related To This Project
Hermitage, PA
Bid Date: Apr 18 2024
Hermitage, PA
Bid Date: Apr 15 2024
Hermitage, PA
Bid Date: May 09 2024
Hermitage, PA
Bid Date: Feb 17 2021
Hermitage, PA
Bid Date: Aug 24 2020
Hermitage, PA
Bid Date: Feb 20 2019
Hermitage, PA
Bid Date: Sep 28 2020
Hermitage, PA
--
Hermitage, PA
Bid Date: Apr 12 2024
Hermitage, PA
Bid Date: Mar 13 2024
Hermitage, PA
--
Hermitage, PA
Bid Date: Oct 13 2023
Hermitage, PA
Bid Date: Sep 28 2023
Hermitage, PA
Bid Date: Apr 02 2022
Hermitage, PA
Bid Date: May 06 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.