BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in New Paltz, New York. Working plans call for the renovation of a residential development.

This project was cancelled. Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The State University of New York reserves the right to reject any or all bids. All work on this contract is to be completed within/by 82 calendar days after the date of the Notice To Proceed. Work must commence no earlier than May 20, 2024, and must be substantially completed by August 9, 2024. Ridgeview Hall work must be completed by June 21, 2024. The scope of work for this project consists of providing all labor, supervision, tools, equipment, removals, legal disposal of all debris, and supplying of all designated materials and incidentals necessary or convenient for repair painting in Residence Halls. The main features of the work shall include, but are not limited to the following: Major work includes: Preparing existing painted surfaces for new paint finish, including removal of loose paint finish and adhesives, drywall / plaster patching, repairing holes and gouges, sanding, and priming. Moving and protection of existing furniture within rooms. Ridgeview Hall: Supplying and installing new paint finish at walls, soffits, hollow metal frames, and trim in bedrooms (estimated 120 rooms). Esopus Hall: Supplying and installing new paint finish at walls, soffits, hollow metal doors and frames, and trim. Areas to be painted include bedrooms (estimated 130 rooms), corridors, lounges, lobbies, vestibules, and exit stairs (walls and railings). List of paint colors and types will be provided with documents. Contractor shall provide and maintain full access and egress in and out of building entry locations. Contractor, Contractors employees, and all sub-contractors to Contractor shall park employee vehicle(s) in University approved location(s) during all times of work, and each contractor and sub-contractor employee shall purchase a contractor parking hang tag for the duration of the work period, no exceptions. Contractor shall provide all labor, supervision, project coordination, tools, equipment, demolition, legal removals, and the legal recycling, disposal, and reporting of all construction waste for completion of the Work. Contractor shall be fully responsible for reviewing all dimensions, all material quantities necessary, and all new work indicated or shown on construction documents and specifications prior to bidding. Contractor shall provide daily project clean-up of debris created by the Work, restoration of existing adjacent areas disturbed by this contract work, and final cleaning of all areas of the completed Work. Contractor shall leave completed Work areas in a ready to use condition. All work shall be completed in accordance with applicable manufacturer's materials standards, applicable NY State Building Code requirements, and applicable Federal & State regulations. Contractor shall follow and adhere to the Campus Impairment Program as it pertains to the Work. Contractor shall not disrupt the existing campus fire alarm system during the Work, no exceptions. All dumpsters and storage trailers shall have solid wood members placed under wheels of these items to protect existing conditions, and dumpsters shall be placed on asphalt paving, unless approved in advance by the University. Locations of these items must also be approved by the University before any deliveries or installation, no exceptions. RIDGEVIEW HALL START DATE: NO EARLIER THAN MAY 20, 2024 END DATE: NO LATER THAN JUNE 21, 2024 ESOPUS HALL START DATE: NO EARLIER THAN MAY 20, 2024 END DATE: NO LATER THAN AUGUST 9, 2024. EEO Contract Goals 10% Minority Labor Force Participation 10% Female Labor Force Participation To ensure that SDVOB Enterprises are afforded the opportunity for meaningful participation in the performance of the University's contracts, and to assist in achieving the SDVOB Act's statewide goal for participation on state contracts the University hereby establishes an overall goal of 6% for SDVOB participation for this solicitation.

Final Planning

Residential Subdivision

$60,000.00

Public - State/Provincial

Renovation

7

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
231
Bidding Soon
3,937
All Active Projects
1,773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

img_map_placeholder

1 Hawk Dr, New Paltz, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.