BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Bel Tiburon, California. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

The Project includes the following Work: 1. Empty, clean, and return to operation two anaerobic digesters in a sequence that allows one to be in operation at all times. 2. Perform various digester structural improvements including crack repair. 3. Remove, clean, coat, and reinstall both digester covers. 4. Demolish and install various valves, pipes, and pipe supports. 5. Clean, video and coat pipes. 6. Replace sludge grinder and control panel. 7. Perform various concrete improvements throughout the Site. 8. Install various metal improvements, including handrails, grating, and guiderails. 9. And related work shown on drawings and project manual. All work shown in the Design Drawings and Specifications not allocated to an alternate. All work shown on G101, G102, G601, G602, G901, G902, X101, X102, X901, X902, D101, D102, S101, S301, & S302. All work shown on Drawings X103, D103, and E101-106, including: Demolish existing and install new in-line sludge grinder, piping, valve, associated concrete, and vendor control panel. Refer to Section 46 24 23 - Sludge Grinder and Section 26 09 16 - Control Equipment Accessories. All work shown on Drawings X104, D104, and S102, including: Demolish concrete shown on Drawings. Install 4" wide trench drain and 12"x12" drain box. Connect trench drain to drain box and then to existing drain box as shown in Drawings. Install SST guiderails for dewatered sludge hopper/dumpster. Pour, form and grind concrete as specified in Drawings. Repair concrete structural beam. All work shown on Drawings X105, D105, and S103, including: Contact FKC to replace panel 2 of screw press. Install foul air duct and connect to existing. Design and install pipe support system. Install rigid foul air duct drop legs as specified in Drawings. Demolish elbow under screw press and replace with tee. Design and install replacement FRP grating and support. Repair concrete as specified in Drawings. Refer to Section 06 82 00 - Fiberglass Reinforced Plastic Fabrications, Section 40 05 07 - Pipe Support Systems, and Section 05 52 46 - Mechanically Fastened Aluminum Railings.

Award

Water / Sewer

$2,514,400.00

Public - County

Paving, Site Work

42

30

21

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
79
Bidding Soon
1,778
All Active Projects
739
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2024

June 28, 2024

img_map_placeholder

2001 Paradise Dr, Bel Tiburon, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.