Renovation of a development in Jamestown, Tennessee. Completed plans call for the renovation of a development.
Question Deadline 04/09/2024 Any prospective Respondent having questions and comments concerning this ITB must provide them in writing to the Solicitation Coordinator. All questions must be submitted A. The Contractor shall build out overhangs on each end of house. Overhang shall be twenty-four (24) inches wide to match overhang on the front and back of house. B. The Contractor shall remove shingles and cut roof sheathing back to second and third trusses and make new decking longer to come out even with overhang on both ends of house. New sheathing shall be the same as existing sheathing. C. The Contractor shall remove soffit and facia on front and back of house and shall install new rafter tails cut the same pitch as the roof to ensure facia is one hundred percent (100%) vertical or plumb. Facia boards shall be two (2) inch x six (6) inch spruce. D. The Contractor shall remove the existing cricket on the chimney and shall construct a new larger cricket with the valleys passing the corners of the chimney. E. The Contractor shall delete two (2) wind turbines and one (1) exhaust vent and patch holes with same roof sheathing as the existing roof sheathing. F. The Contractor shall install ice and water shield around perimeter of building and install synthetic felt on entire roof. The Contractor shall install drip edge around entire building and new pipe boots. G. The Contractor shall install new GAF Timberline HDZ shake wood color shingle or equal. The Contractor shall install new omni coil ridge vent and install shingle ridge cap to match shingles. Park shall supply all roofing materials. The Contractor shall supply plywood, lumber, and framing materials. H. The Contractor shall build front deck (6-foot x 6-foot) using 6-inch x 6-inch posts 2-inch x 10-inch joists with 5/4-inch decking, with steps and install black powder coated aluminum handrails around deck and down steps to sidewalk. All materials shall be pressure treated. The Contractor shall form and pour concrete sidewalk 4-foot wide x 46-feet long and 4-inches thick with three (3) rolls of 1/2 - inch rebar from deck to driveway. I. The Contractor shall build a 6-foot x 6-foot side deck using 6-inch x 6-inch posts, 2-inch x 10-inch joists and 5/4 decking; all materials shall be pressure treated. The Contractor shall build steps down to concrete slab, install black powder coated aluminum handrails around deck and down steps. The Contractor shall install 8-foot x 8- foot shed type roof over deck. J. The Contractor shall install eleven (11) new construction vinyl windows with nailing fin; windows shall be almond color. Windows shall be single hung, energy star, low E glass with no grids between glass. Three (3) of the windows shall be mulled together to make one unit. This will be a total of eight (8) single windows and one (1) triple unit. The Contractor shall install four (4) inch window tape around edges of all windows for weather tight seal. K. The Contractor shall install three (3) exterior door units. 1. Side door shall be thirty-two (32) inch LH hinge, 9-lite with blinds between the glass, insulated metal door of standard height and jambs with dead bolt bore. 2. Rear door shall be one set of French doors. French doors shall be standard height and standard jambs, 6-foot-wide right-side door opens with LH hinge and dead bolt bore and shall have full view windows with blinds between the glass. Doors shall be insulated metal doors. 3. Front door shall be Craftsman style with side lite and privacy glass on door and side lite. The door shall be insulated metal with deadbolt bore and standard height and jambs. Doors shall be painted using two (2) coats Sherwin Williams lifetime warranty paint or another equal brand and quality; park staff shall choose color. All doors shall have new doorknobs and deadbolts that are keyed alike; park staff shall pick hinge and doorknob colors. L. The Contractor shall install stranded Tyvek house wrap, or equal, on entire building, install LP smart siding 38 series cedar texture 8-inch lap siding, or another equal brand and quality, on exterior using 540 series cedar texture 1- inch x 4-inch trim on all corners, doors, and windows. Install LP smart siding 38 series cedar texture on all facias. M. The Contractor shall install James Hardie vented soffit on all over hangs. Install James Hardie solid soffit on porch ceiling. James Hardie soffit may be substituted for another brand of equal quality N. The Contractor shall paint all siding and trim, soffit, and facias using two (2) coats of Sherwin Williams lifetime warranty paint or equal. Park staff shall choose colors. O. The Contractor shall use Dap 230 Dynaflex paintable caulking on all exterior siding, trim, soffit, and facias or equal. P. The Contractor shall install six (6) inch k-style gutters with downspouts and install gutter guards on all gutters. The entire building shall have gutters. Park staff shall choose gutter color. Q. The Contractor shall install all necessary flashing around decks, porch, and chimney and behind siding joints. Interior work: A. The Contractor shall install new kitchen base and wall cabinets, with cabinets being constructed with maple wood and shall have a natural polyurethane finish. Cabinets shall have Corian countertops with 4-inch back splash with built in sink bowl and new Delta or another equal brand single lever faucet with sprayer. The Contractor shall install new sink baskets, drain lines, and braided supply lines with cutoffs. Cabinet doors shall be raised panel and have soft close hinges, and drawers will have ball bearing soft closing slides. Park staff shall choose countertop colors and shall choose all hinge and door hardware. B. The Contractor shall install cabinets in the configuration of attached drawings. C. The Contractor shall install a new Frigidaire slide-in oven Model # FCFE3062AB or equal. D. The Contractor shall install a new Whirlpool range hood Model# UXT4030ADB or equal. E. The Contractor shall install all necessary trim for a finished project.
Post-Bid
Conservation and Development
$800,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2024
May 8, 2024
4605 Pickett Park Hwy, Jamestown, TN
Related To This Project
Jamestown, TN
Bid Date: May 09 2024
Jamestown, TN
Bid Date: Jun 12 2024
Jamestown, TN
Bid Date: Jun 12 2024
Jamestown, TN
Bid Date: Aug 16 2024
Jamestown, TN
Bid Date: Aug 16 2024
Jamestown, TN
Bid Date: Aug 05 2024
Jamestown, TN
Bid Date: Oct 28 2024
Jamestown, TN
Bid Date: Sep 12 2024
Jamestown, TN
Bid Date: Mar 25 2024
Jamestown, TN
Bid Date: Feb 08 2024
Jamestown, TN
Bid Date: Jan 17 2024
Jamestown, TN
Bid Date: Jan 18 2024
Jamestown, TN
Bid Date: Oct 04 2023
Jamestown, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.