BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Oklahoma City, Oklahoma. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and parking garage.

Scope of Work: Conduct a structural analysis of Santa Fe Parking Garage to determine if the garage structure will support the deadload of the proposed pedestrian bridge and based on the outcome provide final construction plans for a pedestrian bridge spanning North E. K. Gaylord Boulevard from the Santa Fe Parking Garage east to Park Avenue. The proposed pedestrian bridge would tie into the Santa Fe Parking Garage at the 2nd floor, which is 21-feet above grade. This elevation will allow the bridge to meet the ODOT requirement of 14-feet minimum overhead clearance for E.K. Gaylord. The pedestrian bridge span would consist of a 104-feet long by 24-feet wide by 16-feet high, with an 8-feet wide walkway enclosed with glass sides 8-inch high through the center of the truss. The walkway would be covered by elevated stretched fabric canopy that would allow for free air circulation between the walkway and canopy. The fixed limit of construction is based on an alternative design if the structural analysis determines the Santa Fe Depot cannot support the proposed dead load. This alternative design would include two elevator towers, one on the east side and west side of the project within the current right of way. The alternative design may impact the roadway alignment with a reduction of one lane to support the towers as well as American with Disabilities Act compliant sidewalk. The fixed Limit of Construction Cost is $5,009.760. The City and its Trust reserve the right to award the Contract(s) or not and to revise the Scope of Services and/or the Project scope or description, as may be in the best interest of the City or Trust. Timeline: The Conceptual Report is due by the end of September 2024. Final plans are due within 120 calendar days after the preliminary report delivery date. All questions must be submitted through the electronic bidding system at Online by 10:00 a.m. on April 1, 2024. Answers to the questions will be posted in by 10:00 a.m. on April 8, 2024.

Post-Bid

Bridges / Tunnels

$5,009,760.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
426
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

June 17, 2024

img_map_placeholder

Multiple Locations, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.