BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a playground / park / athletic field in Calgary, Alberta. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The objective of this project is to procure construction contractor services for the installation of a 4-stall concrete vault toilet facility and select site furnishings at Marshall Springs Day Use Site. The successful proponent must ensure the new facility adheres to the Alberta Forestry & Parks standards. Additionally, the contractor is responsible for making all necessary adjustments to the site to accommodate the new vault toilet facility. The vault toilet facility shall provide a functional, safe, and compliant restroom facility that meets the needs of the visitors at Marshall Springs Day Site. SCOPE OF WORK: 1. Mobilization/Site Preparation and Site Maintenance: Including, but not limited to, site grading, and maintenance as required to establish access, set up work area, and maintain work area. Contractor is to notify the Province upon completion of Site Preparation works prior to commencing the construction of the vault toilet. 2. Concrete 4-Stall Washroom Building: Including the supply and construction of one (1) pre-fabricated concrete 4- stall vault washroom building complete with: a. Precast concrete septic tanks; b. Precast concrete toilet building structure; c. Wood truss and metal clad roof; d. All building accessories as identified on the drawings; e. Landscaping finishing work 3. Informational Kiosk: Including the supply and construction of one (1) informational kiosk. 4. Grading and Landscaping: Including the grading and landscaping of the area to accommodate the building and access. 5. Shop Drawings: The contractor shall provide shop drawings for approval by Alberta Forestry and Parks. 6. Demobilization/Site Cleanup: Including, but not limited to demobilization of all equipment, and general cleanup of the site to the satisfaction of the Province. 7. Documentation, Updates and Closeout: The contractor shall document all work with photographs and send regular project updates. The contractor shall provide all closeout documentation including as-builts, manuals, warranties, etc Fish Creek Provincial Park, Marshall Springs Day Use Site, 50.921945, -114.113272 The deadline for inquiries is 2:00:59 PM

Award

Playgrounds / Parks / Athletic Fields

$186,100.00

Public - State/Provincial

Renovation, Site Work

11

7

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
12
Bidding Soon
294
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

April 30, 2024

img_map_placeholder

Fish Creek Provincial Park, Calgary, AB

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.