Site work and outdoor lighting for a road / highway in Hortonville, Wisconsin. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

**As of April 8, 2024, This project has been awarded to Bodart Electric Service, Inc. , with the awarded amount of $43,428.50.** Scope of Work: o Remove and Recycling the 3-standing Light Poles From the West Comer of Etd, East. o Removal and Disposal of the 5-concrete Bases Shown on Drawing to a Depth of 1' Below Grade and Remove the Existing Pole Wiring. o Provide New Conduit and Wiring From the Electrical Cabinet on Etd Per National Electrical Code. Backfill the Trench With Marking Tape One Foot Above the Conduit and Fill Trench With Gravel. Keep in Mind the Olk St Lighting Wiring is Also Included in This Conduit to Refeed Those Lights. If a Site Visit is Needed, Contact the Voh. If Needed- Cutting and Patching of Concrete for the High School Driveway to Be Included. Install 5-new 18" Concrete Bases Poured to a Depth of 6' Below Grade and 1' Above Grade With Electrical Conduit Centered on the Concrete Base. The 5-new Street Light Poles to Be Double Head Poles to Match Nos. Specifications for Installation for Each Pole Are Included. Wiring, Assembly and Mounting or the New Poles to Be Included. o Installation to Meet Manufacturer Specifications for Fixtures and Products Identified on Page 2. o Street Lighting to Be Disconnected for No Longer Than 1-working Week While the Project is Completed. o Damage Caused During the Project to Concrete Street Curbing, or the Sidewalk is the Responsibility of the Contractor to Remove and Repair at the Contractor's Own Cost. o Permits and Contacting Diggers Hotline Prior to Start of the Project Are the Responsibility of the Contractor and Should Be Included in the Bid Proposal. Contract Voh if Needed. o Include a One Year Warranty on Installation of Underground Wiring and Pole/fixture Installation. Topsoil and Replanting Will Be Done by the Voh. Installation and Removal Can Start on June 10 at the Earliest and Shall Be Finished by Aug. 23rd. Voh Reserves the Right to Accept or Reject Any Bids Due to Inaccurate Findings.

Award

Roads / Highways

$43,429.00

Public - City

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
20
Bidding Soon
330
All Active Projects
132
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

E Towne Dr, Hortonville, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.