BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2024 at 8:00 PM

Updated June 28, 2024

Site work and paving for a road / highway in Altus, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The AMA/CITY OF ALTUS reserves the right to accept or reject any and/or all portions therefore, or to waive any informalities in the bidding. CONTRACT TIME If awarded the Contract, the UNDERSIGNED agrees to complete the work within 120 calendar days of the commencement of the Contract Time. SCOPE OF WORK After the construction work has been completed, the CONTRACTOR shall remove all debris, trash, excess materials, form lumber, etc., occasioned by CONTRACTOR’S work from the premises, and shall leave the construction site in workmanlike condition and in a neat appearance for the final acceptance. All excavation shall be backfilled and all excess excavated materials shall be disposed of as specified. Waste heaps where permitted, shall be dressed up and left in a neat appearance. All stakes, guy wires, braces, etc., occasioned by the work shall be pulled up or cut off at the ground and removed from the premises. SCOPE OF WORK This work shall include the construction of Portland cement concrete paving. The work shall be carried out to the lines and grades called for by the drawings. This work shall be in accordance with Section 414 of the Standard Specifications for Highway Construction, Edition of 2009, published by the Oklahoma Transportation Commission. Deadline for questions is 3:00 PM on Thursday, April 11, 2024. Send questions to the Designer, Kayla Copeland, and the City Engineer, Johnny Barron

Award

Roads / Highways

$980,916.00

Public - City

Paving, Site Work

23

11

27

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
7
Bidding Soon
199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2024

May 20, 2024

Project location map

Multiple Locations, Altus, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.