BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Simi Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Estimated value for schedule 1 is $2,043,000 and schedule 2 is $1,135,000. No contractor or subcontractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015, unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5, or unless the contractor or subcontractor qualifies for an exception from this requirement, for bid purposes only, as set forth in Labor Code section 1771.1(a). If contractor or subcontractor believes that such an exception in 1771.1(a) applies, it must provide the applicable exception(s) in its bid proposal. Even those contractors or subcontractors who qualify for an exception under 1771.1(a) must be registered with DIR at the time of award, if such award is made on or after April 1, 2015. No contractor or subcontractor may be awarded a contract for public work on a public works project awarded on or after April 1, 2015 unless registered with DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the DIR. SCOPE OF WORK: The Annual Minor Streets Rehabilitation Program will consist of: Schedule I 1) 579,789 S.F. of asphalt pavement cold milling; 2) 5,500 tons of asphalt placement; 3) 4,764 S.F. of sawcut, removal, and reconstruction of sidewalk; 4) 48 sawcut, removal, and reconstruction of curb ramps; 5) 1,562 S.F. of sawcut, removal, and reconstruction of concrete cross and/or longitudinal gutter; 6) 776 L.F. of concrete sidewalk grinding; 7) 100 L.F. of sawcut, removal, and reconstruction of concrete curb and gutter; 8) 2,398 S.Y. of crack seal treatment; 9) 67 sewer manhole frame and cover replacement; 10) 33 water valve assembly replacement; 11) traffic signing and pavement delineation; 12) construction surveying; and 13) all appurtenant work as provided in the Proposed Schedule of Work and Prices. The specified completion time is 50 consecutive working days after receipt of the Notice to Proceed. Schedule II 1) 266,925 S.F. of asphalt pavement cold milling; 2) 2,550 tons of asphalt placement; 3) 391 S.F. of sawcut, removal, and reconstruction of sidewalk; 4) 18 sawcut, removal, and reconstruction of curb ramps; 5) 495 S.F. of sawcut, removal, and reconstruction of concrete residential driveway; 6) 137 L.F. of concrete sidewalk grinding; 7) 25 L.F. of sawcut, removal, and reconstruction of concrete curb and gutter; 8) 20 sewer manhole frame and cover replacement; 9) 33 water valve assembly replacement; 10) 37,238 S.Y. of crack seal treatment; 11) 37,238 S.Y. of type II slurry seal; 12) traffic signing and pavement delineation; 13) construction surveying; and 14) all appurtenant work as provided in the Proposed Schedule of Work and Prices. The specified completion time is 70 consecutive working days after receipt of the Notice to Proceed. Schedule I shall be considered the "Base Contract" for purposes of awarding the contract. All bids must be sealed and submitted at or before 3:30 p.m., on April 30, 2024. The Proposal shall be submitted and the work shall be performed by a State of California Class A licensed contractor in strict conformance with Specification No. SV 24-09, and now on file in the City's Department of Public Works and the Office of the City Clerk. All questions concerning the bid document should be directed to the Associate Engineer/Capital Projects, Department of Public Works, at (805) 583-6791. All prospective bidders shall abide by the provisions of the Bid Terms and Conditions listed in the project's specifications. The City reserves the right to retain all proposals for a period of 60 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to determine and waive nonsubstantial irregularities in any proposal, to reject any or all proposals, to reject one part of a proposal and accept the other. The bid shall be balanced so that each bid item is priced to carry its share of the cost of the work and also its share of the contractor's overhead and profit. The City reserves the right to delete any bid item to the extent that the bid is qualified by specific limitation. An unbalanced bid shall be considered as grounds for rejecting the entire bid. The City further reserves the right to make award to the lowest responsive and responsible bidder as the interest of the City may require. Bid Result Item #1 Toro Enterprise $2,409,575 Item #2 Toro Enterprise $3,504,174

Award

Roads / Highways

$5,913,749.00

Public - City

Paving, Site Work

35

11

5

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
202
Bidding Soon
3,188
All Active Projects
1,354
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 7, 2024

July 8, 2024

October 7, 2024

img_map_placeholder

Multiple Locations, Simi Valley, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.