Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 18, 2024 at 8:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in Joint Base Mdl, New Jersey. Contact the soliciting agency for additional information.
This is the official solicitation for the FY24 Maintenance and Repair (M&R) recompete at JB MDL NJ. Please read through the solicitation in its entirety and view all attachments. The project consists of, but is not limited to, the following: asbestos abatement/removal, lead and lead based paint abatement/removal, masonry, electrical, painting, and carpet laying. Project Title: FY24 Maintenance and Repair recompete at Joint Base McGuire Dix Lakehurst (JB MDL), New Jersey (NJ) Project Location: JB MDL A) The project consists of, but is not limited to, the following: asbestos abatement/removal, lead and lead based paint abatement/removal, masonry, electrical, painting, and carpet laying. B) This solicitation will result in a single award requirements contract and is set aside for a HUBZone small Businesses. The contract will consist of a one-year base period plus four one-year option periods and a 6 month extension of services, if exercised. Future Orders will be issued against the CLIN prices established under the terms and conditions of the awarded contract when a requirement is known and funding becomes available. C) The NAICS code is 236220 and the size standard is $45,000,000.00. D) Enter proposal price in Att J-8 "Bid Schedule" with individual unit prices rounded to the nearest hundredth. Only complete the individual prices within each worksheet of the Att J-8 Bid Schedule Workbook; the solicitation price schedule listed as line items 0001, 1001, 2001, 3001, 4001, and 5001 are for the totals of the correlating period of performance. E) Contractor should reference Section L, Instructions, Conditions, and Notices to Offerors for preparation of proposals. The solicitation will be evaluated using price/past performance information as stated in section M. F) In accordance with DFARS 236.204, the estimated contract ceiling of this construction project ranges between $25,000,000.00 and $100,000,000.00. G) Past performance questionnaires will be due NLT 3pm EST on 30 April 2024. H) All questions will be submitted to william.kearns.4@us.af.mil or dana.wright.6@us.af.mil NLT 16 April 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$40,397,627.00
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2024
June 3, 2024
Multiple Locations, Joint Base Mdl, NJ
Related To This Project
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
Bid Date: Aug 15 2024
Joint Base Mdl, NJ
Bid Date: May 28 2024
Joint Base Mdl, NJ
Bid Date: Sep 19 2024
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
Bid Date: Sep 16 2024
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
Bid Date: May 07 2024
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
--
Joint Base Mdl, NJ
Bid Date: Oct 10 2019
Joint Base Mdl, NJ
Bid Date: Jul 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
FY24 Maintenance and Repair (M&R) at Joint Base McGuire Dix Lakehurst (JBMDL)
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.