Site work for a water / sewer project in Wichita, Kansas. Completed plans call for site work for a water / sewer project.

The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Shawn Mellies, P.E., Project Engineer, at (316) 268-4632 or smellies@wichita.gov. 1. 2. 3. 4. 5. Start Date. The work order on this project shall be issued 30 (thirty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. Working Days/Completion Date. The work on this project shall be completed within 45 (forty-five) working days from date of beginning work and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed. For calendar-day completion projects, the Contractor is required to work a minimum of six days per week excluding official city holidays. Work, which will require inspection by the Engineer, shall not be permitted on Sundays. Basis of Payment. Payment for the bid items will be as a lump sum/measured quantity amount based on the bid quantities and unit prices in the bid proposal. Approved Materials List. A list of materials approved for use on City of Wichita construction projects can be found on the City website. All approved materials shall conform to the appropriate requirements set forth in the Standard Specifications, and shall have been previously approved by the Material Review Board (MRB). Information on obtaining approval for new materials through the MRB is available on the website. Existing Conditions Documentation. Contractor shall document existing property conditions prior to construction. Documentation shall be video-recorded tape supplemented with 35 mm or digital photographs. Neither videotape nor photographs shall be made from a moving vehicle. One (1) copy of the documentation package shall be provided to the Engineer prior to beginning construction on the project. 6. Project Coordination. The contractor shall be required to coordinate the waterline extension work with the adjacent property owner of Lot 4, Block B of Paddock Industrial Addition. They are in the process of building a building on Lot 4, which has a PPW project for a fire line. 7. Utilities. There are some large, high pressure gas main near the waterline extension. a. KGS. The contractor shall be required to contact Tony Chavez at 316-641-5859 prior to starting construction. Tony may want to be on-site during work near Meridian. b. P-66. The P-66 requirements are that we remain 25 feet away from their gas main and where the lines cross there needs to be at least 18" of vertical separation. 8. Deadline for Questions. For comments that affect bid items and/or quantities: Noon Tuesday prior to bid opening. For questions and comments requiring clarification only: Noon Wednesday prior to bid opening.

Post-Bid

Water / Sewer

$1,440,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
38
Bidding Soon
362
All Active Projects
153
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 12, 2024

June 11, 2024

img_map_placeholder

Multiple Locations, Wichita, KS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.