BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Glenshaw, Pennsylvania. Completed plans call for site work for a water / sewer project.

a. The Contractor shall retain and pay for a testing agency to perform earthwork proofroll evaluations and compaction testing as specified in Section 312000 (in lieu of an Owner's Geotechnical Representative). b. 30" diameter HDPE storm line replacement from catch basin #A1 downslope to flared end outlet shall be included in the Base Bid, as well as specified, compacted earth fill of existing subsidence and sinkholes and finish grading and seeding. Each bid must be accompanied by a Bid Bond, Cashier's Check, Trust Company Treasurer's Check or Certified Check made payable to the Shaler Area School District in an amount of not less than five percent (5%) of the proposal Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond or Check of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. Site Visitation: Bidders are required to attest to the fact that they have visited the site with the submittal of their Bid Form, Section 004116. Final Project Completion Date $500.00 Final Project Closeout Completion Date $400.00 The Owner reserves the right to reject any and all bids when such rejection is in the interest of the Owner, and to reject the bid of any Bidder, who in the Owner's judgment, is not in position to perform the Contract.

Award

Water / Sewer

$567,000.00

Public - County

Site Work

11

20

12

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
40
Bidding Soon
798
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2024

July 11, 2024

img_map_placeholder

705 Scott Ave, Glenshaw, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.