BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Cascade, Idaho. Working plans call for site work for a road / highway; and for paving for a road / highway.

The French Hazard WUI Project area lies along the eastern slope of West Mountain near Cascade, Idaho. The surrounding communities are listed in the National Fire Plan (USDA 2000) as communities at risk from wildfire. The West Mountain Geographic area has been identified as a community at risk under the Valley County wildland fire mitigation plan. The Boise NF has determined the West Mountain Geographic area meets the definition of an at-risk community as defined in the HFRA. The project requires road construction and reconstruction to facilitate future vegetation and prescribed fire treatment activities within and adjacent to the project area. The new road (435A8) is approximately 2.4 miles long, Operational Maintenance Level (ML) 2, closed to public motorized use and open to administrative use only. Additionally, road reconstruction will occur on approximately 10 miles of system roads (Roads 435, 435A, 435G, and 438). complete it within 165 calendar days after receiving All questions concerning this solicitation should be submitted to traci.davis@usda.gov no later that 19 April 2024 by 1700 MST. In accordance with FAR 36.204, the magnitude of this project is estimated to be between $500,000 to $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 156.01 This work consists of controlling and protecting public traffic adjacent to and within the project. 201.01 This work consists of clearing and grubbing within clearing limits and other designated areas. 204.01 This work consists of excavating material and constructing embankments. This work also includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material. The following governs construction for both pay item 20402A and 20402B 212.01 General This work consists of reference staking drainage structures and control points, marking clearing limits, clearing, and grubbing, slash treatment, excavation, and embankment, including haul and end haul, erosion control, material source development, turf establishment, to construct roadways and associated features within the specified alignment and grade tolerances. 625.01 This work consists of soil preparation, watering, fertilizing, seeding, and mulching. Seeding and mulching methods are designated as dry or hydraulic. 205.01 This work consists of fracturing rock and constructing stable final rock cut faces using controlled blasting and production blasting techniques. Controlled blasting uses explosives to form a shear plane in the rock along a specified backslope. Controlled blasting includes presplitting and cushion blasting. Production blasting uses explosives to fracture rock.

Final Planning

Roads / Highways

$1,000,000.00

Public - Federal

Paving, Site Work

18

9

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
21
Bidding Soon
349
All Active Projects
125
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 6, 2024

January 20, 2025

October 15, 2025

img_map_placeholder

Multiple Locations, Cascade, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.